My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-013-RES-APPROVING BID & AWARDING CONTRACT FOR REPLACEMENT OF CONCRETE CURB & GUTTERS, DRIVEWAY APPROACHES AND REINFORCED CONCRETE SIDEWALKS IN THE CITY
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2009
>
2009-013-RES-APPROVING BID & AWARDING CONTRACT FOR REPLACEMENT OF CONCRETE CURB & GUTTERS, DRIVEWAY APPROACHES AND REINFORCED CONCRETE SIDEWALKS IN THE CITY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 12:31:56 PM
Creation date
3/16/2009 4:37:43 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2009-013-RES
Doc Type
Resolution
CITY CLERK - Date
2/23/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF PA.RIS <br />DEPARTMENT OF PUBLIC WORKS <br />SPECIFICATIONS FOR <br />DEMOLTi`ION AND CONSTRUCTION OF <br />CURB/GUT~D DRNEWAY APPROACEIES <br />STAND <br />Requirements- <br />4,000 square feet of Driveway <br />It is estimated that 5,000 linear feet of Cnrb and Gntter, <br />Concrete Sidewalk will be repaired during <br />Approaches and 2,500 square feet of Reinfo~OlO. <br />the penod of March 1, 2009 through March 1, <br />Exact quantities ox feet cannot be determin ~,e bu~e eq are f ~e S,~t~,e t t4P~'ations <br />Quanhhes may be increased or decreased to <br />Division of the Public Works Depariment during the period shown above. Minimum quantities <br />aze not guaranteed. <br />S p ecification s/Re(juirements : <br />Demolition and construction of Curb/Gutter, Stan.dard Driveway Approaches and Concrete <br />Sidewalk must conform to the following guidelines and attached drawings. <br />A) APProved bidder is responsible for the demolition, disposal and cleanup of existing <br />curb/gutter, driveway approaches or sidewalk. <br />g) Approved bidder is responsible fox the construction of new curb/gutter, driveway Act approaches or sidewalk. A11 construction must comply wi ~.~io ~ D~ fic ~ ons or <br />and standard TXDOT specifications, except as amended by p~ sP <br />drawings to be provided by the City. <br />C) A.pproved bidder is responsible for keeping the project area clean during construction and <br />he is responsible for final cleanup of project site. <br />D) All bids must be accompanied by a properly executed and completed Insurance Affidavit <br />in the form attached wiih this Bid Proposal. <br />E) Within 10 days after written notification of aWar e oro~ bY ~e C''ty A bidder <br />Y <br />shall execute and furnish to the City a contract m a form apP ~,e~ of attomeys <br />along with. (1) a Perf°~ance bond and a payment bond, with Po <br />attached, each in the fuil amount of the contract price, executed by a surety company or ved suretY <br />surety companies authorized to execute surety bonds and fro ~en St~a 2~°a p operly <br />companies maintained by the United States Treasury DeP <br />executed Certificate of Insurance evidencing that the successful bidder has met all the <br />Insurance Requirements required herein. <br />
The URL can be used to link to this page
Your browser does not support the video tag.