My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11 10-Year Capital Improvement Plan Update
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2009
>
03 March
>
2009-03-23
>
11 10-Year Capital Improvement Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2009 2:24:56 PM
Creation date
3/20/2009 2:24:56 PM
Metadata
Fields
Template:
AGENDA
Item Number
11
AGENDA - Type
MISCELLANEOUS
Description
11 10-Year Capital Improvement Plan Update
AGENDA - Date
3/23/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> CITY COUNCIL AGENDA ITEM BRIEFING SHEET <br /> <br /> Submittal Date: Originating Department: F/Director By: <br /> 3-18-2009 pier, P.E. City Engineer Agenda ItemNo.: <br /> Council Date: Engineering f Public Works <br /> 3-2 3-2009 11. <br /> RECOMMENDED MOTION: <br /> Not an action item <br /> POLICY ISSUE(S): <br /> 10-Year Capital Improvement Plan Update <br /> <br /> BACKGROUND: <br /> A 10-year capital improvement plan (CIP) was submitted to the City Council in December 2008, <br /> consisted of water, sewer and street projects that have been prioritized by the Engineering, Water <br /> Distribution, Sewer Maintenance and Street Departments. The 2008-2009 CIP called for two water line <br /> replacement projects, one sewer line replacement project, a sewer plant master plan, the purchase of a <br /> sewer camera, crack sealing, seal coating and paving Castlegate Drive with plant mix seal: <br /> <br /> • Hayter Engineering is near completion on a set of plans that will include replacing a two inch <br /> water main in both Culbertson and Cleveland Streets from 19`h S.E. to 24h S.E. and Phase II of <br /> the W. Washington St. sewer line replacement. These projects are scheduled to bid in the few <br /> weeks and be completed later this summer. <br /> <br /> • Hayter is also working on a proposal to perform Phase I of the sewer plant master plan. <br /> <br /> • The search is currently still underway for a new sewer camera. We have had two different sewer <br /> camera manufactures come and perform several demonstrations in our sewer and storm sewer <br /> system. We should be ready to order a new camera in the next couple of weeks. <br /> <br /> • The Street Department has completed this year's crack sealing list and they are currently <br /> preparing the roads that will be seal coated. Castlegate will be paved with plant mix seal which <br /> is an asphalt material that is applied to a street about 3/ of an inch think. Plant mix seal provides <br /> an intermediate step between seal coat and asphalt overlay which usually involves milling about <br /> two inches of material off the surface of the roadway and then applying two new inches of <br /> asphalt. <br /> <br /> Two additional projects have been added to the list. The first project was the water line replacement in <br /> the 1500 -1700 Block of Lamar Avenue that cost was approximately $40,000. The second project <br /> entails replacing 600-feet of sewer line in Brown St. that intersects 19th S. W. in the 1100 block. We <br /> have had 74 sewer calls in the past 4 years and the majority of the calls are for a stopped up sewer main. <br /> The estimate for this project is approximately $39,000.00. <br /> <br /> BOARD/ COMMISSION RECOMMENDATION: <br /> N/A <br /> EXHIBITS: <br /> 2008-2009 project list for water, sewer and streets <br /> <br /> <br /> <br /> <br /> <br /> City of Paris <br /> (11) (1( ! Revised 2/04/08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.