Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> Utilities <br /> *In Progress <br /> 1. Complete negotiations with Next Era Energy <br /> 2. Complete study of Lake Pat Mayse <br /> 3. Conduct study of wastewater treatment plant feasibility of new wastewater treatment <br /> plant in different location <br /> 4. Conduct study of master lift station <br /> 5. Pursue opportunities to access American Recovery and Reinvestment Act funding <br /> <br /> ♦Pending <br /> 6. Develop water plant capital plan, including filter and piping rehab <br /> 7. Implement security enhancements for water plant <br /> 8. Implement security enhancements for wastewater plant <br /> 9. Rehabilitate east elevated water tank <br /> 10. Install a grit & screenings facility at the flow equalization basin <br /> 11. Upgrade electrical system Pat Mayse Lake intake <br /> 12. Develop phased program to equip lift stations to accept portable power <br /> 13. Rehabilitate Lake Crook dam <br /> 14. Rehabilitate drying beds at the wastewater treatment plant, including the under drain <br /> system <br /> 15. Install two additional variable frequency drives at the Master Lift Station <br /> 16. Install three (3) additional variable frequency drives at Pat Mayse Intake <br /> 17. Replace Smith Creek bridge at water treatment plant <br /> 18. Replace drainage structure under Lake Crook Road at water treatment plant <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> City of Paris Needs Assessment Page 8 <br /> <br /> 0 <br />