My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
16 Resolution awarding the bid asbestos abatement at One Oak Place Apt.
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2009
>
04 April
>
04-27-09
>
16 Resolution awarding the bid asbestos abatement at One Oak Place Apt.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2012 8:38:05 AM
Creation date
4/24/2009 4:02:43 PM
Metadata
Fields
Template:
AGENDA
Item Number
16
AGENDA - Type
RESOLUTION
Description
One Oak Place Apartments asbestos
AGENDA - Date
4/27/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Brady Environmental Services, Inc. <br />TECHNICAL SPECIFICATIONS <br />PART I. GENERAL <br />1.1 SCOPE OF WORK <br />1.1.1 Project Description <br />1.1.1.1 The asbestos abatement project at One Oak Place <br />apartment building located 655 Graham in Paris, <br />Texas at covers the removal and disposal of all known <br />asbestos-containing materials as follows: <br />a.) Approximately 1800 square feet of asbestos- <br />containing floor tile and mastic from kitchen <br />areas of various units. <br />b.) Approximately 400 square feet of asbestos- <br />containing floor tile and mastic from unit 103. <br />c.) Approximately 89000 square feet of asbestos- <br />containing sheetrock wall material located <br />throughout all units. <br />d.) Approximately 29000 square feet of spray-on <br />ceiling texture. <br />1.1.2 Responsibilities <br />1.1.2.1 The contractor shall be responsible for verifying all <br />quantities and field conditions in the field prior to <br />submitting his bid. <br />1.1.3 Supplies <br />1.1.3.1 The contractor shall supply all supervision, labor, <br />materials, services, insurance, licenses, patents and <br />equipment necessary to carry out the work described <br />herein. <br />1.1.5 Abatement <br />1.1.5.1 Full, differential pressure containments shall be <br />established. Each containment shall enclose all <br />asbestos-containing materials scheduled for removal. <br />-2- CS09055 <br /> <br />. 0002(l6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.