My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
13-Plat approval
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2009
>
07 July
>
07-13-2009
>
13-Plat approval
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2012 7:53:28 AM
Creation date
7/10/2009 8:40:18 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
13.
Doc Type
Agenda
CITY CLERK - Date
7/13/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM <br />TO: Mayor and City Council <br />Planning and Zo ing Coinmission <br />FROM: Shawn Napier, P. <br />Director of Engi g, Planning and Development <br />DATE: July 2, 2009 <br />SUBJECT: Coplin Square CB 249 Preliminary Plat <br />I have reviewed the preliminary plat of the above referenced addition. It appears that the <br />preliminary plat complies with the City of Paris subdivision regulations with the following <br />exceptions. <br />1. Provide the acreage for lot 1 and 2. <br />2. No preliminary drainage plan was submitted, note #2 on the plat states that a detailed <br />drainage plan to be provided with site plan on each lot. <br />3. Submit civil site plans to the Engineering, Planning and Development Department for <br />review. <br />1 recommend approval of the preliminary plat upon completion of the above items. <br />cc: Kevin Carruth, City Manager <br />Brandon Chaney, P.E., R.P.L.S., Chaney Engineering Inc. <br />D. Wayne Brown <br />- DO11103 <br />
The URL can be used to link to this page
Your browser does not support the video tag.