Laserfiche WebLink
15. <br />Remove existing manhole. <br />3EA <br />$ <br />$ <br />16. <br />Erosion control fence. <br />70 LF <br />$ <br />$ <br />17. <br />Stub-out and tie to existing <br />$ <br />12" VCP. <br />1 EA <br />$ <br />18 <br />Stub-0ut and tie to existing <br />. <br />10" VCP. <br />1 EA <br />$ <br />$ <br />19. <br />Stub-out and tie to existing <br />$ <br />8" VCP. <br />1 EA <br />$ <br />20 <br />Stub-out and tie to existing <br />6" VCP. 1 EA $ $ <br />21. Abandon old line. 1 EA $ $ <br />22. Gravel drive repairs. 65 LF $ $ <br />23. Near side service transfer 1EA $ $ <br />24. Manhole drop structure 2 EA $ $ <br />TOTAL BID: $ <br />(USE WORDS) (FIGURES) <br />5. BIDDER agrees that the Work «-ill be substantialiy completed and ready for final payment within <br />105 calendar days after the date NN•hen the Contract Time commences to run, as provided in the <br />General Conditions. <br />BIDDER acccpts the provisions of the Agreement as to $115 per calendar day liquidated damages <br />in the event of failure to complete the Work on time. <br />6. The following documents are attached to and made a condition of this BID: <br />(a) Required Bid Security in the form of <br />7. Communications concerning this Bid shall be addressed to the address of BIDDER indicated <br />below. <br />8. The terms in this Bid, which aze defined in the General Conditions of the Construction Contract, <br />included as part of the Contract Documents have the meanings assigned to them in the General <br />Conditions. <br />SUBMITTED on .20 <br />Of the above total - Base Bid, $ is for materials actually incorporated <br />in the Work, and $ is for all other costs. <br />16 <br />000269 <br />