My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
13-City of Paris and Chalaire Surveying agreement
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2009
>
07 July
>
07-27-2009
>
13-City of Paris and Chalaire Surveying agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2012 8:02:44 AM
Creation date
7/24/2009 11:54:36 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
13
Doc Type
Agenda
CITY CLERK - Date
7/27/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date: 5/ 15/2009 <br />C Client: The City of Paris <br />` CHALAIRE SURVEYING, INC. <br />Attn: Shawn Napier <br />BOUNDARY • TOPOGRAPHY • CONSTRUCTION <br />Page: 1 of 2 Scope of Work and Cost Estimate (hourly rates) <br />Project: Collegiate Drive Realignment <br />Phase: Topography <br />Description: Utility location <br />Labor Type: Survey Tech <br />Hours• 3 Rate: $60.00 Cost: $180.00 $180.00 <br />Notes <br />Coi7tact DigTE5S, municipality for field marking, C~ize & type. <br />;scription: <br />Field work - extend existing horizontal and vertical control. <br />bor Type: <br />2-man crew <br />Hours: <br />6 <br />Rate: <br />$90.00 <br />Cost: <br />$540.00 <br />$540.00 <br />Notes: <br />Set new points, traverse., and level loops. <br />°scription: <br />Field work <br />bor Type: <br />2-man crew <br />Hours: <br />32 <br />Rate: <br />$90.00 <br />Cost: <br />$2,880.00 <br />$2,880.00 <br />Notes: <br />900 if both side,, 3100 lf supplement previous work (west side), brush cutting. <br />escription: <br />Process field work <br />ibor Type: <br />Survey Tech <br />Hours: <br />4 <br />Rate: <br />$60.00 <br />Cost: <br />$240.00 <br />$240.00 <br />Notes: <br />Reduce fielcl traverse, level loops, (Drocess electronic data. <br />escription: <br />Drafting <br />ibor Type: <br />Draftsman/Survey Tech <br />Hours: <br />16 <br />Rate: <br />$60.00 <br />Cost: <br />$960.00 <br />$960.00 <br />Notes: <br />Compile clata in graphic form to create topographic map <br />escription: <br />RPLS <br />Hours: <br />12 <br />Rate: <br />$80.00 <br />Cost: <br />$960.00 <br />$960.00 <br />Notes: <br />Project coordination, QA/QC, contour generation <br />escription: <br />Administration <br />abor Type: <br />Admin. <br />Hours: <br />4 <br />Rate: <br />$45.00 <br />Cost: <br />$180.00 <br />$180.00 <br />Notes: <br />Miscellaneous administrative tasks. <br />i <br />Subtotal: $5,940.00 <br />~ U(1Q086 <br />
The URL can be used to link to this page
Your browser does not support the video tag.