Laserfiche WebLink
7/23/2009 <br />Recommendations <br />Continued <br />B. Recapture the effluent from its wastewater treatment plant, and from <br />Campbell Soup, by constructing the Consultant's suggested diversion <br />structure at Hicks Creek, and diverting this water back to Lake Crook. <br />Operate Lake Crook and Pat Mayse as a system with water from Lake <br />Crook being the first water sold to an outside entity. Use the existing <br />pipelines from Pat Mayse to the water treatment plant to carry additional <br />water supply from Pat Mayse to Lake Crook as needed. System operation <br />plus use of return flows would increase firm yield about 12 MGD. <br />C. Provide local sponsorship, possibly in conjunction with other interested <br />entities for a Corps of Engineers study to determine the viability of <br />reallocation of Pat Mayse flood control storage to water supply storage. <br />D. Pursue the ConsultanYs return flow Scenario B by constructing a <br />diversion structure on Pine Creek near the Red River, catching all return <br />flows from Pine Creek through that point and selling it to the outside <br />contracting entity. <br />13 <br />Questions? <br />14 <br />~ ~~onlnL 7 <br />