Laserfiche WebLink
C <br />;S CHALAIRE SURVEYING, INC. <br />BOUNDARY • TOPOGRAPHY • CONSTRUCTION <br />Date: 5/ 15/2009 <br />Client The City of Paris <br />qttn: Shawn Napier <br />Page: 1 of 2 <br />Scope of Work and Cost Estimate (hourly rates) <br />Project: Collegiate Drive Realignment <br />Phase: Topography <br />Description: <br />Utility location <br />Labor Type: <br />Survey Tech <br />Hours: <br />3 <br />Rate: <br />$60.00 <br />Cost: <br />$180.00 <br />$180.00 <br />Notes: <br />Contact Dig,TESS, municqpality for field markiri;, size & type. <br />Description: <br />F'ield work - extencl existing horizontal ancl vertical control. <br />Labor Type: <br />2-man crew <br />Hours: <br />6 <br />Rate: <br />$90.00 <br />Cost: <br />$540.00 <br />$540.00 <br />Notes: <br />Set new points, traverse, and (evel loops. <br />Description: <br />Field work <br />f .ahor Tvoe: <br />2-man crew <br />_ <br />Hours <br />32 <br />Rate: <br />$90.00 <br />Cost: <br />$2,880.00 <br />$2,880.00 <br />Notes: <br />900 If both sides, 3100 lf supplement previous work (west side), brush cutting. <br />scription: <br />Process field work <br />bor Type: <br />Survey Tech <br />HoUrs: <br />4 <br />Rate: <br />$60.00 <br />Cost: <br />$240.00 <br />$240.00 <br />Notes: <br />Reduce field iraverse, levei loops, process electronic data. <br />!scription: <br />Drafting <br />bor Type: <br />Draftsman/Survey Tech <br />Hours: <br />16 <br />Rate: <br />$60.00 <br />Cost: <br />$960.00 <br />$960.00 <br />Notes: <br />Compile data in graphic form to create topographic m3p <br />~scription: <br />RPLS <br />Hours: <br />12 <br />Rate: <br />$80.00 <br />Cost: <br />$960.00 <br />$960.00 <br />Notes: <br />Project coordination, QA/QC, contour generation <br />;scription: <br />Administration <br />bor Type: <br />Admin. <br />Hours: <br />4 <br />Rate: <br />$45.00 <br />Cost: <br />$180.00 <br />$180.00 <br />Notes: <br />Miscellaneous administrative tasks. <br />Subtotal: $5,940.00 <br />