My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-071-RES-City of Paris received a proposal from Hayter Eng. for services for plans for the Main Street sidewalk
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2009
>
2009-071-RES-City of Paris received a proposal from Hayter Eng. for services for plans for the Main Street sidewalk
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 12:37:41 PM
Creation date
8/5/2009 2:57:48 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2009-071
Doc Type
Resolution
CITY CLERK - Date
7/13/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.5.3 Iiiterpretations and Clarifications <br />ENGINEER shall issue necessary interpretations and clarifications of the contract <br />documents and in connection therewith prepare work directive changes and change orders, <br />as required. <br />2.5.4 Silop Drawings & Substitutes <br />E`:I~GINEER shall review or take appropriate action, on substitute materials proposed by <br />CONTRACTOR, shop drawings, samples and other data which CONTRACTOR is <br />required to submit, but only for general conformance with the design concept of the <br />project and the information given in the contract documents. Such review shall not extend <br />to means, methods, techniques, sequences or procedures of construction or to safety <br />precautions and programs incident thereto. <br />2.5.5 Inspections and Tests <br />ENGINEER shall have authority, as CITY'S representative, to require special inspection <br />or testing of the work, and shall receive and review all cei-tificates of inspections, testing <br />and approvals required by laws, regulations, codes, orders or the contract documents, to <br />de~ermine generally that their content complies with the requirements of, and the results <br />certified indicate compliance with, the contract documents. <br />2.5.6 Disputes between CITY and CONTRACTOR <br />ENGINEER shall act as initial interpreter of the contract documents and judge of the <br />acceptability of the work, and make decisions on all claims of CITY and CONTRACTOR <br />relating to the acceptability of the work or the interpretation of the requirements of the <br />contract documents. ENGINEER shall not be liable for the results of any such <br />intorpretations or decisions rendered in good faith. <br />2.5.7 Apolications for Payment <br />Based on ENGINEER'S observations as an experienced and qualified design professional, <br />on information provided by the on-site observer and on review of applications for <br />payment and the accompanying data and schedules; ENGINEER shall determine the <br />amount owed to CONTRACTOR and recommend in writing payments to <br />CONTRACTOR. This recommendation will constitute a representation to CITY that the <br />woik has progressed to the point indicated, and that, to the best of ENGINEER'S <br />kitcwlccige, iiifurmation and beliel', the quality of such work is generally in accordance <br />witll the contract documents. However, ENGINEER will not thereby be deemed to have <br />macie exhaustive, continuous or detailed reviews or examinations to check the quality or <br />qua:Itity of CONTRACTOR'S work as it is furnished, beyond the responsibilities <br />specifically assigned to ENGINEER in this Agreement and the contract documents. <br />
The URL can be used to link to this page
Your browser does not support the video tag.