My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-083-RES-Awarding the contract for the purchase of materials for the water system improvements
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2009
>
2009-083-RES-Awarding the contract for the purchase of materials for the water system improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 12:39:30 PM
Creation date
8/21/2009 8:55:32 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2009-083
Doc Type
Resolution
CITY CLERK - Date
8/10/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGREEMENT <br />THIS PROCUREMENT AGREEMENT is dated as of the 10lh day of August in he year 2009 by <br />and between the City of Paris (hereinafter called OWNER) and Underground Utility Supply <br />(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br />agree as follows: <br />Article 1. WORK <br />CONTRACTOR shall supply all Materials as specified or indicated in the Procurement <br />Documents. The Materials to be furnished are generally described as follows: <br />Materials Procurement for Water System Improvements <br />ORCA STEP #728056 and HEI #180038 <br />Article 2. ENGINEER <br />The Materials have been specified by Hayter Engineering, Inc., Paris, Texas, who is hereinafter <br />called ENGINEER and who is to act as OWNER'S representative, assume all duties and <br />responsibilities and have the rights and authority assigned to ENGINEER by OWNER in <br />connection with the furnishing of Materials in accordance with the Procurement Documents. <br />Article 3. POINT OF DELIVERY <br />The place where the Materials are to be delivered is the City back lot, 50 W. Hickory, Paris, TX <br />75460. <br />Article 4. CONTRACT TIME <br />4.1 The Materials are to be delivered to the point of delivery and ready for OWNER'S <br />acceptance of delivery: <br />on (or within a period of fifteen days prior to) the 30lh (thirtieth) day after the date when <br />Contract Time commences to run as provided in paragraph 2.2 of the Procurement <br />General Conditions. <br />4.2 All Shop Drawings and samples required by the Procurement Documents will be <br />submitted to ENGINEER for review and approval: <br />within 7 days after the date when the Contract Time commences to run as provided in <br />paragraph 2.2 of the Procurement General Conditions. <br />4.3 Liquidated Damages: OWNER and CONTRACTOR recognize that time is of the <br />essence of this Procurement Agreement and that OWNER will suffer financial loss if the <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.