Laserfiche WebLink
f Documents are sufficient in scope and detail to indi ~rie Mand a e alsey understanding of all <br />terms and conditions for performance and furnishing <br />~ <br />~ 5, Inte retations and Addenda <br />~ 5.1. All questions about the meaning or intent of the Procurement Documents are to be <br />~ directed to Engineer in writing. Interpretations or clarifica maa ed or del'veredt o <br />Engineer in response to such questions will be issued by Addenda <br />~ all parties recorded by Engineer as having received the Bidding Documents. Questions <br />' received less than five days prior to the date for opening of Bids may not be answered. other Only questions answered by formal written Add arid effe tl wheh eiby E g nand °r by <br />~ interpretations or clarifications will be without 1 g <br />any officer, agent, or employee of Owner or Engineer, or any other person. <br />5,2. Addenda may also'be issued to modify the Bidding Documents as deemed advisable by <br />~ pwner or Engineer. <br />6, Bid Srity <br />6.1. A bid bond is not required. <br />7, Contract Time <br />See applicable provisions of the Procurement Agreement and the Procurement General <br />Conditions. <br />~ g. Liquidated Damages <br />i~ for liquidated damages, if any, are set forth in the Procurement Agreement. <br />Provisions <br />y 9. SubstitutP nr "Or-Equal" Items <br />~ The Contract, if awarded, will be on the basis of material bleqs bstit teeorrib~edequale <br />drawings or specifications without consideration of poss <br />items. Whenever it is indicated in the Drawings or sp ma 1 be furn shedao ~ usedaby <br />~ substitute or "or-equal" item of in ete~iaa ° ton m nt for such acceptance will not be <br />Contractor if acceptable to Engin , pPlica <br />considered by Engineer until after the Effective Date ofs derat on by Engin procedure <br />set <br />~ for submission of any such application by Contractor and con Which <br />forth in paragraphs 7.3, 7.3.1, and 7.3.2 of the Procurement General Conditions, <br />may be supplemented in the Procurement General Requirements. <br />~ <br />3 <br />~ <br />; ~ll <br />