Laserfiche WebLink
SUPPORT INFORMATION FOR INFRASTRUCTURE PROJECTS <br />Provide the following information for any infrastructure activity (included on the Sources and Uses of Funds): <br />(1) Water Improvements <br />(a) Indicate when the treatment facility was constructed. <br />(b) If reconstruction or replacement of lines is involved, indicate when the existing line(s) were installed, the diameter(s) <br />of the existing line(s), the material type of the existing lines, and the previous history regarding line cleaning or TVed. <br />(c) Indicate the design flow and/or population capacity for the existing faciliTy before and after any proposed <br />improvements. <br />(d) Indicate the source of water for the system. <br />(e) Indicate the average daily and peak time demands for the existing jurisdiction before and after any proposed <br />expansion relating to this project. <br />( fl Indicate if any of the existing capacity/pressure improvements and any of the proposed improvements (such as <br />looping or gate valves) are primarily for fire protection. Indicate if fire hydrants currently exist and if any are being <br />proposed for this project. Does the applicant have an adequate water supply, adequate water pressure, and an <br />adequate number of fire hydrants to fight local fires? <br />(g) Indicate if acquisition of real property (including easements and rights-of-way) is needed for this project. <br />(h) Indicate if there are any special assessments, including service connection costs and fees, involved relating to this <br />project. <br />