My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-109-RES-Agreement between COP and TxDot for S. Collegiate Dr. Extension, Expansion and Realignment
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2009
>
2009-109-RES-Agreement between COP and TxDot for S. Collegiate Dr. Extension, Expansion and Realignment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 12:42:36 PM
Creation date
10/14/2009 9:59:59 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2009-109
Doc Type
Resolution
CITY CLERK - Date
9/28/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CSJ # 1452-01-013 <br />District # Paris <br />Code Chart 64 # <br />Project: <br />CFDA#: <br />ATTACHMENT A <br />Payment Provision and Work Responsibilities <br />The Local Government will pay for the cost of the realignment of the north and south intersections of <br />FM 1507 with Collegiate Drive, Hot Mix Asphalt surface on Collegiate Drive and drainage <br />improvements. The intersection realignments will create a stop condition on FM 1507 (two places) <br />and remove the stop condition on Collegiate Drive (two places). The Local Government's <br />participation is 100% of the cost of this particular improvement. The Local Government's estimated <br />cost of this additional work is $300,000.00, including construction items, and engineering and <br />contingencies. The State has estimated the project to be as follows: <br />Description <br />Total <br />Estimate <br />Local <br />Participation <br />Local <br />Participation <br />Cost <br />% <br />Cost <br />% <br />Cost <br />Realignment of North <br />$30,000.00 <br />0% <br />$0.00 <br />100% <br />$30,000.00 <br />Intersection <br />Realignment of South <br />$70,000.00 <br />0% <br />$0.00 <br />100°/o <br />$70,000.00 <br />I ntersection <br />Hot Mix Asphalt <br />$45,000.00 <br />0% <br />$0.00 <br />100% <br />$45,000.00 <br />Surface <br />Drainage <br />$155,000.00 <br />0% <br />$0.00 <br />100% <br />$155,000.00 <br />Im rovements <br />Subtotal <br />$300,000.00 <br />$0.00 <br />$300,000.00 <br />Direct State Costs <br />$0.00 <br />0% <br />$0.00 <br />100% <br />$0.00 <br />(including plan review, <br />inspection and <br />oversi ht <br />Indirect State Costs <br />$0.00 <br />0% <br />$0.00 <br />0% <br />$0.00 <br />(no local participation <br />required except for <br />service roects <br />TOTAL <br />$300,000.00 <br />$0.00 <br />$300,000.00 <br />Direct State Cost will be based on actual charges. <br />Local Government's Participation (100%) _ $300,000.00 <br />It is further understood that the State will include only those items for the improvements as requested <br />and required by the Local Government. This is an estimate only; final participation amounts will be <br />based on actual charges to the project. <br />AFA-AFA VoITIP Page 8 of 8 Revised 07/10/2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.