My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-110-RES-Accepting proposal of Hayter Engineering to provide design and specifications for S. Collegiate Dr. extension and expansion
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2009
>
2009-110-RES-Accepting proposal of Hayter Engineering to provide design and specifications for S. Collegiate Dr. extension and expansion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 12:42:45 PM
Creation date
10/14/2009 10:03:16 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2009-110
Doc Type
Resolution
CITY CLERK - Date
9/28/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br />Schedule of Per Diem Rates <br />March 2009 <br />Personnel Hourly Rates <br />Principals <br />140.00 <br />Project Managers <br />115.00 <br />Project Engineer <br />80.00 <br />Intern Engineers <br />75.00 <br />Senior Technicians <br />68.00 <br />CAD Technician <br />45.00 <br />Draftsmen <br />27.00 <br />Administrative Assistant <br />42.00 <br />Environmentalist <br />50.00 <br />On-Site Observer <br />45.00 <br />Surveyor <br />85.00 <br />Survey Technician <br />40.00 <br />Survey Crew - 2 Man Party <br />85.00 <br />Survey Crew - 3 Man Party <br />125.00 <br />This Schedule of hourly rates may be inodified by the ENGINEER at his discretion. Time billed for <br />per diem rate services shall be in minimum increments of 1/4 hour. <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.