My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
26-Receive update on West Gate Apartments
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2009
>
12 December
>
12-14-2009
>
26-Receive update on West Gate Apartments
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2012 4:24:48 PM
Creation date
12/11/2009 7:50:41 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
26
Doc Type
Agenda
CITY CLERK - Date
12/14/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Westgate Rehab Requirements <br />Electrical: <br />• Units need to be rewired (most units have extensive damage from theft of copper wire) <br />• Services need to be brought up to code <br />• HVAC (heating, ventilation, Air Conditioning) units need to be replaced <br />Construction: <br />• Asbestos Survey needs to be complete <br />• Roofs need new shingles & replace decking as needed <br />• Replace glass in all broken windows <br />• Remove Black Mold <br />• Replace sheetrock as needed (Black Mold, Asbestos & Damage - as applicable) <br />• Repair and replace plumbing as needed (All plumbing must be tested) <br />Fire Safety: <br />• Each unit needs to be fire sprinkled - R13 system <br />• Build firewall from bottom plate to roof deck between units. 2 layers of 5/8" firerock. <br />Must be fire caulked as needed for penetrations <br />• Each unit needs hardwired 110V smoke detectors with a battery back up <br />- ' - iL 5i' 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.