My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-051-ORD ESTABLISHING CRITERIA FOR INITIATION AND TERMINATION OF DROUGHT RESPONSE STATES
City-of-Paris
>
City Clerk
>
Ordinances
>
1889-2010
>
2009
>
2009-051-ORD ESTABLISHING CRITERIA FOR INITIATION AND TERMINATION OF DROUGHT RESPONSE STATES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2012 11:15:56 AM
Creation date
12/18/2009 3:58:39 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2009-051
Doc Type
Ordinance
CITY CLERK - Date
12/14/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(c) 1.3 times the normal water charge per 1000 gallons for water diversions <br />and /or deliveries in excess of the monthly allocation from ten percent (10 %) <br />through fifteen percent (15 %) above the monthly allocation. <br />(d) 1.4 times the normal water charge per 1000 gallons for water diversions <br />and /or deliveries more than fifteen percent (15 %) above the monthly allocation. <br />The above surcharges shall be cumulative. <br />"Sec. 34 -181 Variances <br />(a) The City Manager, or his authorized designee, may, in writing, grant a <br />temporary variance to the pro rata water allocation policies provided by this Plan if <br />it is determined that failure to grant such variance would cause an emergency <br />condition adversely affecting the public health, welfare, or safety and if one or more <br />of the following conditions are met: <br />(1) Compliance with this Plan cannot be technically accomplished during <br />the duration of the water supply shortage or other condition for which <br />the Plan is in effect. <br />(2) Alternative methods can be implemented which will achieve the same <br />level of reduction in water use. <br />(b) Persons requesting an exemption from the provisions of this Plan shall file a <br />petition for variance with the City Manager, or his authorized designee, within 5 <br />days after pro rata allocation has been invoked. All petitions for variances shall be <br />reviewed by the City Manager and shall include the following: <br />(1) Name and address of the petitioner(s). <br />(2) Detailed statement with supporting data and information as to how <br />the pro rata allocation of water under the policies and procedures <br />established in the Plan adversely affects the petitioner or what damage <br />or harm will occur to the petitioner or others if petitioner complies <br />with this Ordinance. <br />(3) Description of the relief requested. <br />(4) Period of time for which the variance is sought. <br />(5) Alternative measures the petitioner is taking or proposes to take to <br />meet the intent of this Plan and the compliance date. <br />(6) Other pertinent information. <br />(c) Variances granted by the City of Paris shall be subject to the following <br />conditions, unless waived or modified by the City Manager or his authorized <br />designee: <br />27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.