Laserfiche WebLink
submit a false or sham Bid; BIDDER has not solicited or induced any person, firm, <br />or corporation to refrain from bidding; and BIDDER has not sought by collusion to <br />obtain for itself any advantage over any other Bidder or over CITY. <br />4. BIDDER will complete the Work for the following price: <br />Description of work: Demolition and disposal of various structures at the One <br />Oak Apartment Complex. Bidders should carefully review <br />the Master Specifications included in the Contract <br />Documents to ensure the Bid includes all potential aspects of <br />property removal and disposal. <br />Total Price for All Buildings demolished $ 3 Do o~ <br />/I <br />Additional instructions: The required method of demolition includes wetting of the <br />debris in a section(s) of the One Oak Apartment Complex. <br />The City of Paris will allow the successful Bidder to connect <br />to fire hydrants at the site to obtain water for this purpose; <br />however, Bidders should provide the cost of labor and <br />equipment for connecting to water sources and wetting the <br />debris during demolition. The City reserves the right to <br />perform this service. <br />00 <br />Additional Price for Section(s) of Building(s) Containing Asbestos $ o. <br />~ <br />NOTE: Alternative methods of bidding are recommended and will allow the CITY to <br />determine all possible combinations of demolition. Please attach alternative proposals on <br />company letterhead, explaining the bidding methodology in detail. Alternatives could <br />include different grouping of structures than as requested above, addition of structures <br />within the One Oak Apartment complex which are not specifically listed herein, or <br />alternative demolition methods, so long as such methods are in compliance will all <br />application local, state, and federal regulations governing the demolition of structures <br />containing regulated asbestos-containing materials (RACM). <br />5. BIDDER agrees that the Work will be substantially complete within seventy-five (75) days <br />after the date when the Contract Time commences to run. <br />6. BIDDER accepts the provisions of the Agreement as to liquidated damages in the event of <br />failure to complete the Work on time. <br />7. The following documents are attached to and made a condition of this BID: <br />10 <br />0 <br />