My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20-Deliberate and act on a resolution awarding a bid for the demolition of One Oak Complex at 655 Graham Street
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2010
>
01 January
>
01-25-2010
>
20-Deliberate and act on a resolution awarding a bid for the demolition of One Oak Complex at 655 Graham Street
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2012 4:20:01 PM
Creation date
1/22/2010 6:40:38 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
20
Doc Type
Agenda
CITY CLERK - Date
1/25/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.4 Schedules <br />A. Demolition shall be carried out in such a manner as to protect any adjacent facilities, <br />operations, and personnel as much as possible. <br />4. ASBESTOS <br />4.1 Survey <br />A. Asbestos inspection records indicate an asbestos content within floor, wall, ceiling and <br />roof components in a(n) section(s) of the One Oak Apartment Complex. In their current <br />condition, that section(s) materials are classified by the EPA NESHAP 40 CFR 61.141 <br />as regulated asbestos-containing materials (RACM). <br />B. CONTRACTOR shall obtain from CITY copy of the inspection records and maintain <br />such at the job site throughout project duration. <br />4.2 Permitting/Profiling <br />A. Notices under the National Emissions Standards for Hazardous Air Pollutants <br />(NESHAP) and Texas Department of State Health Services (TDSHS) regulations <br />shall be filed by CONTRACTOR in a timely manner as required for the demolition <br />to start as directed by CITY. CONTRACTOR shall not be responsible for <br />notification fees in their bid. CONTRACTOR shall be responsible for obtaining <br />and filing all additional permits and notices where required by local ordinances. <br />B. CONTRACTOR shall profile waste materials according to landfill requirements. <br />4.3 Regulatory Compliance <br />A. CONTRACTOR shall give all notices and comply with all applicable laws, ordinances, <br />rules, regulations and lawful orders of any public authority bearing on the safety of <br />persons or property or their protection from damage, asbestos exposure, injury or loss. <br />These rules and regulations include, but are not limited to: <br />• EPA's National Emissions Standards for Hazardous Air Pollutants <br />(NESHAPS) 40 CFR Part 61, Sub-parts A and M <br />• Texas Department of State Health Services concerning Texas Asbestos Health <br />Protection Act <br />• OSHA's final Asbestos Rules, for the construction industry, found at 29 CFR <br />Section 1926.1101, and following; and where applicable, for general industry, <br />found at 29 CFR 1910.1001 and following. <br />B. CONTRACTOR shall erect and maintain, as required by existing conditions and <br />progress of the work, all reasonable safeguards for safety and protection, including <br />22 <br />4- 0 Qp 23 %31 p <br />
The URL can be used to link to this page
Your browser does not support the video tag.