My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
18-Deliberate and act on a resolution approving and accepting a proposal for architural services from Denney Architects for the Bywaters Park
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2010
>
04 April
>
04/12/2010
>
18-Deliberate and act on a resolution approving and accepting a proposal for architural services from Denney Architects for the Bywaters Park
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2012 3:28:14 PM
Creation date
4/9/2010 6:19:36 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
18
Doc Type
Agenda
CITY CLERK - Date
4/12/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d. Handrails 8 Guardrails. <br />e. Doors, Frames & Hardware. <br />f. Finishes. <br />g. Fixtures & Specialties. <br />3. Furnishings & Appointments design & documentation [NOT INCLUDED]: <br />4. Structural design & documentation (Kassaw-Dietz Engineering), including: <br />a. General Structural Requirements. <br />b. Structural Foundations. <br />c. Structural Framing. <br />d. Structural Walls. <br />5. Mechanical design & documentation [NOT INCLUDED]: <br />6. Electrical design & documentation, inciuding: <br />a. Generai Electrical Requirements. <br />b. Site Electrical. <br />c. Electrical Power Distribution Systems. <br />d. Electrical Lighting. <br />e, Communications & Alarm Systems. <br />C. BiddinglNegotiation Phase services, including: <br />1. Document Publishing 8 Distribution. (10 sets of final construction documents) <br />2. Final Drawings in Electronic Medium. (1 copy) <br />3. Accessibility Review. <br />4. Energy Code Review. <br />5. Pre-Bid Meetings. <br />6. Bid Opening & Review. <br />NOT INCLUDED: <br />Construction Contract Agreement Preparation. <br />D. Construction Phase services, including: <br />1. Shop Drawing & Submittal Review. <br />2. Construction Observation. <br />3. General Construction Phase Administration. <br />4. Final Punch l.ist & Contract Closeout. <br />NOT INCLUDED: <br />Color & Finish Selections. <br />E. Post-construction Phase services, [NOT INCLUDED]: <br />Final TAS Inspection. <br />Final Energy Code Inspection. <br />Preparation of "As-builY" Drawings. <br />On-site Warranty Follow-up Inspections. <br />We propose to perform the above described architectural & engineering services for an hourly rate not to <br />exceed the sum of <br />Twentv-nine Thousand Eiqht Hundred Dollars IS29.800.001. <br />Fee Breakdown: <br />Proposal for Architecturel Sarvices - Page 2 of 3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.