My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-Deliberate and act on a Resolution authorizing a contract for applying herbicides and outdoor insecticides
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2010
>
05 May
>
05/10/2010
>
11-Deliberate and act on a Resolution authorizing a contract for applying herbicides and outdoor insecticides
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2012 3:17:48 PM
Creation date
5/7/2010 3:52:07 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
11
Doc Type
Agenda
CITY CLERK - Date
5/10/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 4l 061 .'2010 1 3: 15 9037242429 CITr' OF PARIS PAGE 09 <br />6.07} Ali equipment used by the Contractor for herbicide application must be <br />inspected and licensed by the Texas Structural Pest Control Board or <br />Texas Department of Agriculture and must comply w;th all applicable <br />State, Federal and OSHA regulations. The Gontractor shail submit a <br />(isting of equipment to be used with the bid proposal as a basis for the <br />City of Paris to determine the Contractors ability to perform the work <br />within the time frame specified. <br />6.08) A permanent amber caution light will be mounted on top of each piece of <br />equipment that operates from public roads. <br />6.09) The postings of locations to be treated shall be done in accordance with <br />applicable laws and regulations set forth by the Texas Department of <br />Agriculture, Structural Pest Control, EPA and/or State Agencies. <br />7,00) INSPEGTION OF WORK: <br />7.01) Contractor is responsible for inspection of all areas to receive treatment. <br />7.02) The Contractor shall repork any potential problems that are not <br />designated by the prior inspection, such as erodible areas which could be <br />vvorsened by the herbicide application. The Contractor shali contact the <br />City representative and show him/her the questionable area before any <br />work is performed on that site. <br />7,03) No iater than thirty (30) days after completion of each application a joint <br />inspection by representaiives of the contractor and the City of Paris shall <br />be made to de#ermine the effectiveness of the treatment(s). <br />7.04) In any case where the Control is not totaliy effective, follow-up treatments <br />will be applied as required within five (5) days of inspection. Follow-up <br />inspections will be made of areas requiring spot treatments no later than <br />thirty (30) days following treatment to determine effectiveness, of the <br />treatment for further payment. <br />7_05) Inspection findings shall be documented and signed by both <br />representatives and will be utilized to support requests for payment by the <br />Contractor for satisfactory completion of services. <br />7.06) A11 areas treated shall comply with the management of ninety-five percent <br />(95%) control of undesirable vegetation. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.