Laserfiche WebLink
Additions & Alterations to the City Hall <br />City of Paris <br />Paris, Texas <br />Completed 2005 <br />This project was an <br />adaptive reuse of an <br />historical building in which <br />the Architect converted an <br />existing five-bay central fire <br />station space that was <br />recently abandoned after <br />the construction of a new <br />fire station. The existing fire <br />station space was <br />converted to a council <br />chamber space. Necessary <br />ancillary spaces such as <br />Conference Rooms, Toilet <br />Rooms were added. <br />The main thrust of the project was to make the <br />building totally accessible to wheelchair-bound <br />citizens. Ramps and an elevator were installed <br />in the building without destroying the character <br />of the Classical Revivial building, this structure <br />being included on the National Register of <br />Historic Places. <br />Construction was performed by Charlie <br />Clark Construction of Clarksville, Texas, <br />under a lump-sum general contract, for <br />a total cost of $743,650.00 ($136.00/sf). <br />