My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-Presentation on the Lake Pat Mayse Study Committee recommendations
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2010
>
06 June
>
2010-06-14
>
12-Presentation on the Lake Pat Mayse Study Committee recommendations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2012 3:04:28 PM
Creation date
6/11/2010 4:48:29 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
12
Doc Type
Agenda
CITY CLERK - Date
6/14/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HDR-00085438-001 Executive Summary <br />Figure ES-2. Comparison of Future Population Projections for the <br />Lamar County Wafer Supp/y District <br />Manufacturing demand projections were developed by taking the TWDB projections and <br />adding an additional 1 MGD (1,120 acft/yr) of demand. This level of demand could supply a <br />future manufacturing facility comparable to an automotive assembly plant or a beverage bottling <br />company. <br />Steam-electric demand projections as developed by the TWDB were determined to be <br />reasonable for the purposes of this study and no modifications were necessary. <br />According to the 2006 State Water Plan all agricultural demands within Lamar and Red <br />River counties are met from water supply sources that do not supply water to the City. <br />Demand projections anticipated to be met by the City for municipal, manufacturing, and <br />steam-elecri-ic uses within Lamar County are summarized in Table ES-2. This table shows the <br />2060 demands for each category of use and includes existing contract amounts and additional <br />amounts. A comparison of these demands with the estimates from the TWDB 2007 State Water <br />Plan is shown in Table ES-3. Total 2060 demands that will need to be met from the City's <br />supplies are 56,590 acft/yr (50,5 MGD) if the City's existing contracts are not amended and <br />City of Paris - Put Mayse Lake Study <br />January 2009 - Draft im <br />ES-4 An <br />
The URL can be used to link to this page
Your browser does not support the video tag.