My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19-Deliberate and act on a Resolution accepting the bid and approving the proposal from the Spann Concrete Construction
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2010
>
06 June
>
2010-06-14
>
19-Deliberate and act on a Resolution accepting the bid and approving the proposal from the Spann Concrete Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2012 3:05:31 PM
Creation date
6/11/2010 6:12:08 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
19
Doc Type
Agenda
CITY CLERK - Date
6/14/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
428 <br />2001 <br />CONC SLIRF TREAT <br />(CLASS-l <br />120 SY <br />$ <br /> <br />442 <br />2001 <br />STR STL (ROLLED <br />BEAM). 58,577 LB <br />$ <br /> <br />450 <br />2011 <br />RAIL (TY T6). <br />150 LF <br />$ <br /> <br />500 <br />2001 <br />MOBILIZATION. <br />1 LS <br />$ <br />~ <br />540 <br />2001 <br />METAL W-BEAM GD FEN <br />(TIM POST). <br />125 LF <br />$ <br />$ <br />540 <br />2005 <br />TERMINAL ANCHOR <br />SECTION. <br />3 EA <br />$ <br />$ <br />540 <br />2024 <br />TERMINAL ANCHOR <br />SECTION (DRWY). <br />1 EA <br />$ <br />$ <br />658 <br />2241 <br />INSTL DEL ASSM (D-SW)SZ <br />1(FLX) GF2 (BI). 12 EA $ $ <br />TOTAL BID: $ <br />(USE WORDS) (FIGURES) <br />5. BIDDER agrees that the Work will be substantially completed and ready for final <br />payment within 120 calendar days after the date when the Contract Time commences to <br />run, as provided in the Genera] Conditions. <br />BIDDER accepts the provisions of the Agreement as to $1,000 per calendar day <br />liquidated damages in the event of failure to complete the Work on time. <br />6. The following documents are attached to and made a condition of this BID: <br />(a) Required Bid Security in the form of <br />7. Coininunications concerniiig this Bid shall be addressed to the address of BIDDER <br />indicated below. <br />8. The tenns in this Bid, which are defined in the General Conditions of the Construction <br />Contract, included as part of the Contract Documents have the meanings assigned to them <br />in the General Conditions. <br />SUBMITTED on ~ 20 <br />Of the above total - Base Bid, $ is for materials actually <br />incorporated in the Work, and $ is for all other costs. <br />14 <br />129 <br />
The URL can be used to link to this page
Your browser does not support the video tag.