My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
14-Deliberate and act on a Resolution accepting a bid and approving the proposal for reconstruction of S. Collegiate Drive
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2010
>
06 June
>
2010-06-28
>
14-Deliberate and act on a Resolution accepting a bid and approving the proposal for reconstruction of S. Collegiate Drive
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2012 3:12:18 PM
Creation date
6/25/2010 5:22:01 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
14
Doc Type
Agenda
CITY CLERK - Date
6/28/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1'IdZJ C.! lU U0 : VOtl tla~l.cr~ CIlsiilcal ti1fo -<<+ <br />D5. 24" HDPE storm sewez. <br />D6. 18" HDPE storni sewez. <br />192 LF <br />397 LF <br />~ vr <br />$ 7S~ <br />r. - <br />17 ~j 7" -5' <br />---r-- <br />TOTAL DEDUCTIVE .4LTER ~stTE: <br />~sA~.x~ <br />(USE WORDS) (FIGURES) <br />5. BIDDER agrees tha# the Work will be substantially com.pleted and ready for fina] <br />payment vvithin 240 calendar days after the date when the Contract Time cammences to <br />run, as provided in the Creneral Conditions. <br />BIDDER accepts the provisions of the Agreement as to S500 per calendar day liquidated <br />darnages in the event of failure to complete the Work on time. <br />b. The foilowing dacuments are attached to and made a condition of this BID: <br />(a) Required Bid Security in the form of ( t(~ a <br />Comnlunications concerning this Bid shall be addressed to the address of BIDDER <br />indicated below. <br />8. The terms in this Bid, which are defined in the General Conditions of the Construction <br />Contract, included as part of the Contract Documents have the meanings assigned to them <br />in the General Conditions. <br />r--~ <br />SUBMITTED on oN~- ~i- ~ Za~.~__• <br />% <br />Of the above total - Base Bid, $ is for materials actually <br />incoiporatec3 in the Work, and v is foz aIl other costs. <br />~ ya <br /> <br />J, yb ,5/ -710 <br />15a <br />~ i <br />
The URL can be used to link to this page
Your browser does not support the video tag.