My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
15-Deliberate and possibly act on a resolution supporting an application to the Texas Department of Transportation to acquire the historic Goodman rainbow truss bridge from Angelina County
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2010
>
07 July
>
2010-07-26
>
15-Deliberate and possibly act on a resolution supporting an application to the Texas Department of Transportation to acquire the historic Goodman rainbow truss bridge from Angelina County
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2012 3:02:51 PM
Creation date
7/23/2010 7:10:36 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
15
Doc Type
Agenda
CITY CLERK - Date
7/26/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Historic Bridge Condition Survey Report <br />District: <br />County: <br />Bridge Number: <br />Roadway: <br />Feature Crossed: <br />Sufficiency Rating: <br />Inspection Date: <br />Inspector: <br />Luflcin <br />Nacogdoches <br />11-174-0-AA05-10-002 <br />CR 789 <br />Angelina River <br />24.1 (7/3i2007) <br />November 15, 2407 <br />Linwood E. Howell, Jr, P.E. <br />oF <br />~,.r~~~q Z 067 <br />' ; vS <br />* • °s :1 r~ <br />' <br />~~~..........wN.......... <br />L. E. H~3~F~~cLG «t. r4 <br />. .......«o<..,.....~.z p..:~ <br />Gr~562 <br />~1t3 <br />Bridge Description. The bridge consists of 5 simple steel stringer spans on steel supports. The middle 3 spans <br />were originally a sing(e polygonal warren iruss span. The truss was rendered nonfunctionaJ by adding steel <br />piling under 2 of the 5 intermediate truss floorbeams and by replacing the original iruss stringers with larger <br />stringers capable of spanning between the supported floorbeams. The original approach spans had a length of <br />approximately 24 ft. These spans were replaced with longer spans supported on new steel pile abutments located <br />behind the original timber pile abutments that were faiiing. <br />The existing bridge was built in 1993. Details of the original truss suggest that it was fabricated between 19 10 <br />and 1935. The bridge is on a 01 skew. The bridge is posted for a Weight Limit of 17500 Ibs Axie or Tandem <br />(Sign R12-2Tb). <br />The existing bridge is to be replaced. Since proposals are being considered to preserve the original truss, the <br />focus of this report is on the conditian ofthe origina► truss and its suitahi(ity for rehabilitation. <br />~1~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.