My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-083 RES APPROVING THE BID AND AWARDING THE CONTRACT FOR THE TRAIL DE PARIS EXTENSION
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2010
>
2010-083 RES APPROVING THE BID AND AWARDING THE CONTRACT FOR THE TRAIL DE PARIS EXTENSION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 12:19:15 PM
Creation date
7/30/2010 10:28:06 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2010-083
Doc Type
Resolution
CITY CLERK - Date
7/26/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Budget Update <br />Trail de Paris <br />SE 8th St. to SE 12th St. <br />TPWD #RT0819 and HEI #180039 <br />July 22, 2010 <br />Construction Contract <br />It~m : <br />D@Sehi troh <br />fgtimhted <br />QiYanti4 <br />Tatal <br />Ptice <br />Totai <br />PriC~: <br />1 <br />Trail sub rade re aration <br />2,274 SY <br />2.00 <br />4,548.00 <br />2 <br />Trail subbase installation <br />1,404 SY <br />9.75 <br />13,689.00 <br />3 <br />Crushed a re ate base <br />2,274 SY <br />6.25 <br />14,212.50 <br />4 <br />As hattwearin surface <br />1,706 SY <br />11.75 <br />20,045.50 <br />5 <br />Brid e abutments and win walls <br />1 LS <br />13,890.00 <br />13,890.00 <br />6 <br />Brid e lacement and anchorin <br />1 LS <br />6,000.00 <br />6,000.00 <br />7 <br />Fill material between win walls <br />1 LS <br />1,120.00 <br />1,120.00 <br />8 <br />Trail and brid e site radin <br />1 LS <br />25,900.00 <br />25,900.00 <br />9 <br />Com liance with NWP 145 and SWP3 <br />1 LS <br />2,000.00 <br />2,000.00 <br />Total Base Bid <br />a101 405.00 <br />Additive Alternates: <br />A1 <br />Non-sli brid e deck coatin with sandblastin <br />1 LS <br />6,548.00 <br />6,548.00 <br />A2 <br />Brid e aintin other than deck w/ sandblastin <br />1 LS <br />7,577.00 <br />7,577.00 <br />A3 <br />Brid e fencin includin a roaches <br />1 LS <br />3,600.00 <br />3,600.00 <br />A4 <br />H dro-mulch disturbed areas <br />1 LS <br />4,840.00 <br />4,840.00 <br />Total of Addi6ve Alternates Awarded <br />$10,148.00 <br />Non-Construction Contract Work Items <br />1 <br />Railroad Fiat Car <br />14740 <br />2 <br />Culverts w/ headwalls at ori inal brid e site <br />B Cit <br />3 <br />Bollards and Si na e <br /> <br />4 <br />Remove railroad rails <br />B railroad com an <br />5 <br />Remove railroad ties <br />B Cit <br />Non-Construction Contract Work Subtotai <br />$14 740.00 <br />Professional Services <br />1 <br />Environmental <br />1800.00 <br />2 <br />Desi n <br />12750.00 <br />3 <br />Accessibilit Review <br />900.00 <br />4 <br />Desi n Surve s <br />1500.00 <br />5 <br />Geotechnical <br />2750.00 <br />6 <br />Structural Desi n <br />3923.00 <br />Professional Services Subtotal <br />$23,623.00 <br />Total Pro'ect Cost <br />$149 916.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.