My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-083 RES APPROVING THE BID AND AWARDING THE CONTRACT FOR THE TRAIL DE PARIS EXTENSION
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2010
>
2010-083 RES APPROVING THE BID AND AWARDING THE CONTRACT FOR THE TRAIL DE PARIS EXTENSION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 12:19:15 PM
Creation date
7/30/2010 10:28:06 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2010-083
Doc Type
Resolution
CITY CLERK - Date
7/26/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
questions answered by formal written Addend ffect, b whether by ENGINEERhor <br />interpretations or clarifications will be wrthout legal e other erson. <br />by any officer, agent, or employee of OWNER or ENGINEER, or any P <br />$,2 Addenda may also be issued to modify the Bidding Documents as deemed advisable by <br />pWNER or ENGINEER. <br />6. Bid Securit <br />6.1 Each Bid must be accompanied by Bid security made payabl ri thOfo Eof a certiarnount <br />ed or <br />of five percent (5%) of the Bidder s maximum Bid price and bank check or a Bid Bond (on form attache~~ is prescribed) issued by a surety, <br />meeting the requirements of the General Condtions has <br />execute The Bid security of the Successful Bidder will be retaiCUdt nt~rie e p lnthe B d secur t~y <br />the Agreement and furnished the required contract se y, <br />will be returned: If the Successful Bidder fails to exe15teaa d after the Notge of Award, <br />furnish the required contract security within fifteen O Y <br />pWNER may annul the Notice of Award and the Bid security of that Bidder will be <br />forfeited. The Bid security of other Bidders whom b DEER until he earl reasonabl <br />of he <br />chance of receiving the award may be retained y rst seventh (7th) day after the Effective Date of the Agreemen~ oo~ etitnveyw 111 be retained <br />after the Bid opening. Bid security with Bids which are nop <br />no more than seven (7) days after the Bid opening. In the event that Bid Security is in the <br />form of a Bid Bond, it will not be physically returned to the Bidder, except on written <br />request. <br />7, Contract Time <br />lly <br />The number of days within which, or the dates by which, tn e Contracbt T me) areaset <br />completed and also completed and ready for final payme (he <br />forth in the Bid Form and the Agreement. <br />g. Li^uidated Damages <br />Provisions for liquidated damages, if any, are set forth in the Agreement. <br />I 9, Substitute or "Or-Equal" Items <br />The Contract, if awarded, will be on the basis of materials and q <br />substitute eorrib~edequale <br />~ or specifications without co nsideration of possble <br />drawings <br />items. Whenever it is indicated in the Drawings or s pn~ ~aY ibe furne hedao10 used by <br />substitute or "or-equal" item of material or equipm <br />CONTRACTOR if acceptable to ENGINEER, appli le n Dfor ate u of the acceptance n Agreemet o <br />~ ENGINEER until after the Effectiv <br />considered by The <br />procedure for submission of any such application by CONTRACTOR and consideration <br />~ <br />4 <br />~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.