Laserfiche WebLink
CITY OF PARIS <br />UTILITIES DEPARTMENT <br />BID SPECIFICATIONS <br />FOR FURNISHING LIQUID CATIO1vIC POLYACRYLAMIDE EMULSION <br />(FLOCCULANT AID) <br />REQUIREMENTS <br />IT IS ESTIMATED THAT 50.000 LBS. OF LIQUID CATIONIC POLYACRYLAMIDE <br />EMtiLSION 'vk'ILL BE REQUIRED IN THE OPERATION OF THE WASTEWATER TREATMENT <br />PLANT DURtNG THE PERIOD OCTOBER 1, 2010 THROUGH SEPTEMBER 30, 2011. THIS <br />PRODUCT IS USED IN THE DE-WATERING OF SLUDGE. ROTARY DRUM THICKENERS ARE <br />USED TO THICKEN (DE-WATER) THE SLUDGE AFTER THE INJECTION OF THIS POLYMER. <br />AN EXACT QUANTITY CANNOT BE DETERMINED, BUT AN ESTIMATE IS GIVEN ABOVE. <br />QUANTITIES MAY BE INCREASED OR DECREASED TO MEET THE REQUIREMENT OF THE <br />OPERATIONS OF THE PLANT DURING THE PERIOD SHOWN ABOVE. A MINIMUM IS NOT <br />GUARANTEED. <br />A PURCHASE ORDER WILL BE AWARDED TO THE SUCCESSFUL BIDDER AS A RESULT <br />OF THIS INVITATION TO BID. <br />THE BIDDER MAY CANCEL THE CONTRACT AT THE CONCLUSION OF THE CONTRACT <br />FERIOD SHOWN ABOVE BY GIVINTG 60 DAYS PRIOR NOTICE IN wRITING. <br />SPECIFICATIONS <br />'V~'E PRESENTi.Y USE FULYDY~IE CI-1080. THE PRODUCT BID MUST BE F.Q[;AL OR <br />SUPERIOR TO THIS PRODUCT. <br />ANALYSIS OF PRODUCT DELIVERED SHALL BE FURNISHED BY BIDDER WHEN <br />REQUESTED BY THE CITY OF PARIS. <br />A STATEMENT AS TO THE ORIG[N OF THE SUPPLIED PRODUCT SHALL BE FURNISHED <br />BY BIDDER WHEN REQUESTED TO DO SO BY THE C[TY OF PARIS. <br />DELIVERIES <br />DELIVERIES W'ILL BE MADE TO THE WASTEWATER TREATMENT PLANT AT 8600 <br />NORTH MAIN, PARIS, TEXAS 75460. <br />DELIVERIES ARE TO BE MADE [N LOTS OF APPROXIMATELY 1800 POUNDS PER <br />SHIPMENT. SHIPMENT SHOULD BE MADE IN FIFTY-FIVE (55) GALLON DRUMS ON FOUR- <br />WAY WOODEN PALLETS. THERE SHALL NOT BE MORE THAN TWO DRUMS ON ANY <br />PALLET. THE DELIVERY TRUCK SHALL BE CAPABLE OF SETTING A LOADED PALLET ON <br />THE DOCK AT GROUND LEVEL. <br />ROUTINE DELIVERIES MUST BE MADE WITHIN THE HOURS OF 8:30AN1 TO 3:30PM, <br />MONDAY THROUGH FRIDAY. DELNERY MtiST BE MADE WITHIN THREE (3) DAYS <br />FOLLOWING A CONFIRNiED REQUEST FOR EACH DELIVERY. <br />46 <br />