Laserfiche WebLink
CITY OF PARIS <br />UTILITIES DEPARTMENT <br />BID SPECIFICATIONS <br />FOR FURNISHING LIQUID SULFUR DIOXIDE <br />REQUIREMENTS <br />IT IS ESTIMATED THAT FIFTY (50) TONS OF LIQUID SULFUR DIOXIDE WILL BE <br />REQUIRED 1N THE OPERATION OF THE WASTEWATER TREATMENT PLANT DURING THE <br />PERIOD OCTOBER 1, 2010 THROUGH SEPTEMBER 30,2011. <br />EXACT QUANTITIES CANNOT BE DETERMINED, BUT AN ESTIMATE IS GIVEN ABOVE. <br />QUANTITIES MAY BE INCREASED OR DECREASED TO MEET THE REQUIREMENT OF THE <br />OPERATIONS OF THE PLANT DURING THE PERIOD SHOWN ABOVE. A MINIMUNI IS Iv'OT <br />GUARAiVTEED. <br />A PURCHASE ORDER WILL BE AWARDED TO THE SUCCESSFUL BIDDER AS A RESULT <br />OF THIS INVITATION TO BID. <br />THE BIDDER MAY CANCEL THE CONTRACT AT THE CONCLUSION OF THE CONTRACT <br />PERIOD SHOWN ABOVE BY GNING 60 DAYS PRIOR NOTICE M WRITING. <br />SPECIFICATIONS <br />SULFUR DIOXIDE DELIVERED SHALL CONFORM TO AWWA STANDARD B512-97. <br />ANALYSIS OF PRODUCT DELIVERED SHALL BE FURIvISHEU BY EIDDER WHEN <br />REQliESTED Bi' THE CITY OF PARIS. <br />A_ STATEIM7tiT A.S TO THE 9RiGIN OF THF SiJPPLIED PRODUCT SHe_i L BE FURNISHED <br />BY" BIDDER WHEN REQliESTED TO DO SO BY THE C[TY OF YARIS. <br />DELIVERIES <br />DELIVERIES WILL BE MADE TO THE WASTEWATER TREATMEIYT PLANT AT 8600 <br />NORTH MAIN. PARIS, TEXAS 75460. <br />DELIVERIES ARE TO BE MADE IN ONE-TON CYLINDERS. THE CITY OF PAR1S w'ILL <br />MAKE EVERY EFFORT TO ACCEPT DELIVERIES IN TRUCK LOAD LOTS. <br />DELIVERY TRUCK MUST BE CAPABLE OF SETTING CYL[NDERS OFF TRUCK AND ON TO <br />OUR LOADING AREA SO WE CAN PICK IT UP WITH OUR CRANE. <br />ROUTINE DELIVERIES MUST BE MADE WITHIN THE HOURS OF 8:30AM TO 3:30PM, <br />MONDAY THROUGH FRIDAY. DELIVERY MUST BE MADE WITHIN THREE (3) DAYS <br />FOLLOWING A CONFIRMED REQUEST FOR EACH DELIVERY. <br />CERTIFIED WE[GHT TICKETS WILL BE REQUIRED FOR EACH LOAD SHOWING THE <br />EXACT AMOUNT DE[,IVERED. <br />52 <br />