My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
13-Deliberate and possibly act on an Ordinance of the City Council amending Chapter 12 of the Code of Ordinances
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2010
>
08 August
>
2010-08-23
>
13-Deliberate and possibly act on an Ordinance of the City Council amending Chapter 12 of the Code of Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2012 2:52:11 PM
Creation date
8/20/2010 5:11:01 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
13
Doc Type
Agenda
CITY CLERK - Date
8/23/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A plan shall be submitted to the City of Paris for review on the installation <br />and modification of all underground fire mains. <br />Above Ground Fire S, s~ <br />A$75.00 minimum or $.50 per fire sprinkler head whichever is greater with <br />a maximum of $500.00 for plans review. The fee will be calculated <br />according to the amount of sprinkler heads shown on plans. An approved <br />third-party plans review is required when the installation or relocation of <br />sprinkler heads exceeds twenty (20) heads. An approved list of third party <br />fire protection engineers will be provided upon request. <br />Fire Alarm Svstems <br />A$75.00 minimum or $.50 per fire alarm device whichever is greater with a <br />maximum of $500.00 for plans review. The fee will be calculated according <br />to the amount of devices shown on plans. An approved third-party plans <br />review is required when the installation or relocation of devices exceeds ten <br />(10) devices. An approved list of third party fire protection engineers will <br />be provided upon request. <br />(b) Required Fire Construction Permit Fees <br />Underground Fire Main <br />$50.00 permit fee. A construction permit shall be required for the <br />installation or modification of any underground fire main. <br />Above Ground Fire Sprinkler S, st~ <br />$75.00 Minimum or $.50 per fire sprinkler head whichever is greater with a <br />maximum of $500.00 permit fee. The fee will be calculated according to the <br />amount of sprinkler heads shown on plans. <br />Fire Alarm S, st~ <br />$75.00 Minimum or $.50 per fire alarm device whichever is greater with a <br />maximum of $500.00 permit fee. The fee will be calculated according to the <br />amount of devices shown on plans. <br />Fixed Fire Extin uig shing Ss~ <br />A$50.00 permit fee is required for the installation or relocation of each <br />fixed fire extinguishing system. <br />Flammable and Combustible Liquids <br />A construction permit is required to install or remove any above or below <br />ground flammable or combustible liquid tank(s), a fee of $100.00 per tank <br />will be accessed. <br />LP-Gas - A$50.00 construction permit is required for the installation of or <br />modification to an LP-Gas System. <br />Spraving or Dipping - A$100.00 construction permit is required to install <br />15 <br />92 <br />
The URL can be used to link to this page
Your browser does not support the video tag.