Laserfiche WebLink
Above Ground Fire Svstems <br />A$75.00 minimum or $.50 per fire sprinkler head whichever is greater with <br />a maximum of $500.00 for plans review. The fee will be calculated <br />according to the amount of sprinkler heads shown on plans. An approved <br />third-party plans review is required when the installation or relocation of <br />sprinkler heads exceeds twenty (20) heads. An approved list of third party <br />fire protection engineers will be provided upon request. <br />Fire Alarm Svstems <br />A$75.00 minimum or $.50 per fire alarm device whichever is greater with a <br />maximum of $500.00 for plans review. The fee will be calculated according <br />to the amount of devices shown on plans. An approved third-party plans <br />review is required when the installation or relocation of devices exceeds ten <br />(10) devices. An approved list of third party fire protection engineers will <br />be provided upon request. <br />(b~ Required Fire Construction Permit Fees <br />Underground Fire Main <br />$50.00 permit fee. A construction permit shall be required for the <br />installation or modification of any underground fire main. <br />Above Ground Fire Sprinkler S st~ms <br />$75.00 Minimum or $.50 per fire sprinkler head whichever is greater with a <br />maximum of $500.00 permit fee. The fee will be calculated according to the <br />amount of sprinkler heads shown on plans. <br />Fire Alarm S stv ems <br />$75.00 Minimum or $.50 per fire alarm device whichever is greater with a <br />maximum of $500.00 permit fee. The fee will be calculated according to the <br />amount of devices shown on plans. <br />Fixed Fire Extinguishing S sy tem <br />A$50.00 permit fee is required for the installation or relocation of each <br />fixed fire extinguishing system. <br />Flanunable and Combustible Liquids <br />A construction permit is required to install or remove any above or below <br />ground flammable or combustible liquid tank(s), a fee of $100.00 per tank <br />will be accessed. <br />LP-Gas - A$50.00 construction permit is required for the installation of or <br />modification to an LP-Gas System. <br />Spraying or Dipping - A$100.00 construction permit is required to install <br />or modify a spray room, dip tank or booth. <br />15 <br />