Laserfiche WebLink
<br /> <br /> <br /> Form 2335 Project Number. <br /> (08109) (For TxDOT use only) <br /> Page 1 of 1 <br /> Detailed Construction Cost Estimate <br /> Total points available - 15 <br /> Requested SRTS Comm tted Total Cost <br /> Project Type 0 . Unit Unit Price Funding (S) Lord Funds (Si <br /> Pre of Right of Wa ` <br /> TRAIL R,O.W. PREPARATION 1417.00 LF 2.35 3329,95 3329.95 <br /> IREMOVE AND DISPOSE OF EXIST. CONC. 927.00 SY 15.75 1460025 14600.25 <br /> SAW CUT EXIST. CONC. DRIVE.CURB 1826.00 LF 8.00 14608.00 14608,00 <br /> SMALL CLAERING AND GRUBBING 0.092 AC 4600,00 423.20 423.20 <br /> Materials <br /> DRIVEWAY REPLACEMENT 783A0 SY 35.00 27405.00 27405,00 <br /> CONCRETE FOR 4' WIDE SIDEWALKS 5263.00 LF 16.50 86839.50 86839.50 <br /> CONCRETE FOR 12' WIDE SIDEWALKS 650.00 LF 49.00 31850.00 31850.00 <br /> ADA CURB RAMP 41.00 E 850.00 34850.00 34850.00 <br /> STRIPING FOR CROSS WALK 6' WIDE 727.00 LF 1920 .13958.40 13958-40 <br /> STRIPING FOR SCHOOL ZONE 168.00 LF 7.75 1302.00 1302,00 <br /> PAINTED WALK ZONE IN PARKING LOT 540.00 SF 2.00 1080.00 1080.00 <br /> RUMBLE STRIPS IN EXISTING PAVEMENT 504.00LF 13.00 6552.00 6552.00 <br /> NON-FLASHING SCHOOL ZONE SIGN 37.00 EA 500.00 18500.00 18500.00 <br /> FLASHING "SHOOL ZONE" SIGN 5.00 EA 4338.52 21692.60 _ 21692.60 <br /> ADA RAMP 98.00 LF 16.50 1617-00 1617.00 <br /> HAND RAILS 236.00 LF 90.00 21240.00 21240.00 <br /> BIKE RACK 36 BIKES 2.00 EA 1760.00 3520,00 3520.00 <br /> RETAINING WALL 110.00 _ LF 95.00 10450.00 10450.00 <br /> BIKE LANE PROFILE STRIPING 3102.00 LF 2.25 6979,50 6979.50 <br /> BIKE LANE SYMBOL 7.00 EA _ 400.00 2800.00 2800.00 <br /> 4" COMPACTED FLEX BASE 16' WIDE 516,00 TN 25.85 13338.60 13338.60 <br /> 2" HMAC WEARING SURFACE 12' WIDE 1644,00 SY 6.00 11064.00 11064.D0 <br /> Other r Construction Expenses <br /> TRAFFIC CONTROL 2.00 LS 2000 4000 _ 4000 <br /> MOBILIZATION 2.00 LS 4000 BtX)0 8000 <br /> Totals 18807.09 18852.67 360000 360000 <br /> PROJECT BUDGET ESTIMATE AND SOURCE OF FUNDS <br /> This is an estimate only, final participation amounts will be based on actual charges to the project. <br /> Description Requested Committed Total <br /> SRTS Local Estimated <br /> Fund) Funds Cost <br /> nine Fri ineerin PS&E Develo ment J40ut) 0 74000.00 <br /> Environmental no cash contribution 000 0 12000.00 <br /> Ri ht of Wa RO .00 0 0.00 <br /> 0000 0 360000 <br /> lCbf <br /> SUBTOTAL - - - 446000 0 446000 <br /> IConstruction Contingencies 54000 0 54000 <br /> TOTAL 500000 0 500000 <br /> Provide detailed construction cost estimate Information presently available. Use Appendix C: <br /> "Detailed Construction Cast Estimate,"include in this application (an example construction cost <br /> estimate is also provided). Please note: while all authorized project costs are eligable for federal <br /> reimbursement and must be shown above. The amount of project award vAll only be for <br /> construction cost. If applicable, please list any additional funding resources available that will <br /> augment the infrastructure project and describe how these funds will be allocated. <br /> NOTE: Please transfer the totals from the Detailed Constriction Cost Estimate Worksheet to the <br /> corresponding columns under this Project Budget Estimate Worksheel. <br /> Safe Routes to School Program (SRTS) <br /> Infrastructure Project Application <br /> 74 <br />