My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-093 RES APPROVING AN ADVANCE FUNDING AGREEMENT FOR SAFE ROUTES TO SCHOOL PROJECT BETWEEN THE CITY OF PARIS AND TXDOT FOR CHILDREN TO WALIK TO SCHOOL
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2010
>
2010-093 RES APPROVING AN ADVANCE FUNDING AGREEMENT FOR SAFE ROUTES TO SCHOOL PROJECT BETWEEN THE CITY OF PARIS AND TXDOT FOR CHILDREN TO WALIK TO SCHOOL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 12:19:57 PM
Creation date
9/24/2010 12:25:35 PM
Metadata
Fields
Template:
CITY CLERK
Doc Type
Agenda
CITY CLERK - Date
9/13/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Form 2335 <br />(Df3/09) <br />Page 1 oi 1 <br />Praject Number. <br />(FOr TxDOT use only) <br />Detailed Construction Cost Estimate <br />Total points available - 15 <br />I <br />Pro'ect T e <br />p. <br />Und <br />Unit Pnce <br />Requested SRTS <br />EundinB <br />Commttted <br />Loqi Funds <br />Total Cos1i <br /> <br />Pre of Ri ht of Wa <br />~TRAIL R.O.W. pREPARATION <br />1417.00 <br />LF <br />2.35 <br />3329.95 <br />3329.95 <br />'REMOVE AND OISPOSE OF EXIST. CONC. <br />927.00 <br />SY <br />i5.75 <br />14600.25 <br />14600.25 <br />'SAW CUT EXI57. CONC. DRNE.CURB <br />7826.00 <br />LF <br />8,00 <br />14608.00 <br />14608.00 <br />FSMALLCL4ERWGANDGRUBBING <br />0.092 <br />AC <br />4600.00 <br />423.20 <br />42320 <br />Materials <br />DRIVEWAY REPLACEMENT <br />783.00 <br />SY <br />35,00 <br />27405.00 <br />27405.00 <br />ICONCRETE FOR 4' WIDE SIDEWALKS <br />5263A0 <br />LF <br />16.50 <br />8683950 <br />86839.50 <br />CONCRETE FOR 12' WIDE SIDEWALKS <br />650.00 <br />LF <br />49.00 <br />3'I B50.00 <br />31850.00 <br />ADA A CURB R,4MP <br />41,00 <br />EA <br />850.00 <br />34850.00 <br />34850.00 <br />STRIPING FOR CROSS WALK (6' WIDE <br />727.00 <br />LF <br />19.20 <br />13958.40 i <br />13958.40 <br />ISTRIPING FOR SCHOOL ZONE <br />168.00 <br />LF <br />7.75 <br />1302.00 <br />1302.00 <br />PAINTED WALK ZONE IN PARKING LOT <br />540.00 <br />SF <br />2.00 <br />1080.00 <br />1080.00 <br />!RUMBLE STRIPS IN EXISTING PAVEMENT <br />504.00 <br />Lf <br />13.00 <br />6552.00 <br />6552.00 <br />INON-FLASHINGSCHOOLZONESIGN <br />37.00 <br />EA <br />500.00 <br />18500.00 <br />18500.00 <br />iFLASHING"SHOOLZONE"SIGN <br />5.00 <br />EA <br />4338.52 <br />21692.60 <br />21692.60 <br />ADARAt~1P <br />98.00 <br />LF <br />16.50 <br />1617.00 <br />1617.00 <br />HAND RAILS <br />236.00 <br />LF <br />90.00 <br />21240.00 <br />21240.00 <br />BIKE RACK 38 BIKES) <br />2.00 <br />EA <br />1760.00 <br />3520.00 <br />3520.00 <br />RETAfNING WALL <br />110,00 <br />LF <br />95.00 <br />10450.00 <br />10450.00 <br />BIKE LANE PROFILE STRIPING <br />3102.00 <br />LF <br />2.25 <br />6979.50 <br />6979.50 <br />BIKE LANE SYMBOL <br />7.00 <br />EA <br />400.00 <br />2800.00 <br />2800.00 <br />4" COMPACTED FLEX BASE 16'WIDE <br />516,00 <br />TN <br />25.85 <br />13338.60 <br />13338.60 <br />~2" HMAC WEARING SURFACE 12' WIDE <br />1844.00 <br />SY <br />6.00 <br />11064.00 <br />11064.00 <br />~ <br />..i..' .t ♦ha a4 . <br />OtherConsWctionEx enses <br />TRAFFIC CONTROL <br />2,00 <br />LS <br />2000 <br />4000 <br />4000 i <br />MOBILIZATION <br />2.00 <br />LS <br />4000 <br />B000 <br />8000 <br />ITotals <br />18807.09 <br />18852.67 <br />360000 <br />360000 <br />PROJECT BUDGET ESTIMATE AND SOURCE OF FUNDS <br />This isan estimate oNy, final participation amounts will be hased on actual charges to the project. <br />Descrition Re uested <br />Committed <br />ToWI <br />SRTS <br />Lacal <br />Es[imated <br />I <br />Fundin <br />Funds <br />Cost <br />Y <br />ineerin PS&E Develo ment) <br />Prelimina En <br />74000 <br />0 <br />74000.00 <br />Environmenlai (no cash contribufion <br />12000 <br />0 <br />12000.00 <br />Ri bl ot Wa RO <br />0.00 <br />0 <br />O.OD <br />Gotisl~uckioniTtitals•hon74tM1,brksHeet <br />380000 <br />0 <br />360000 <br />SUBTQTAL <br />446000 <br />0 <br />446000 <br />ConsVUCtion Contln encies <br />54000 <br />0 <br />54000 <br />TOTAL <br />500000 <br />0 <br />500000 <br />Provide detailed wnsWclion cost estimate intormation presentty available. Use Appendix C: <br />"Detailed ConstruGion Cost Estimate,"include in this appiication (an examRle construc6on cost <br />eslimale is also provided). Please note: whlte all authorized prqect co51s are eiigable for federal <br />reimbursement and must be shovm above: The amounl af projed award will onfy be for <br />consWCtion cosL B applicabie, please list any adcritionat funding resources availabie that will <br />augment Ne inFrastructure project anddescnbe how tliese funtls will be allocaled. <br />NOTE: Please transfer Me totals fran the Detailed ConsWCiion Cosl Estimale Worksheel m lhe <br />wrcespon0ing columns under this ProjeIX Budget Estlmate Worksheet. <br />Safe Routes to School Program (SRTS) <br />lnfras[ructure Project Applica6on <br />
The URL can be used to link to this page
Your browser does not support the video tag.