My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
30-Grand Theater Historic Pres. Prof. Services
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2010
>
10 October
>
2010-10-25
>
30-Grand Theater Historic Pres. Prof. Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2010 5:27:47 PM
Creation date
10/22/2010 5:27:47 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> Irerra nra <br /> City of Paris <br /> Terracon Proposal No.: P94101076 <br /> September 20, 2010 <br /> <br /> <br /> B. SCOPE OF SERVICES <br /> Hazardous Materials[Waste Technical Specifications <br /> <br /> <br /> Terracon proposes the following sequence for the development of the Hazardous <br /> Materials/Waste (HMW) technical specifications: <br /> <br /> 1. Conduct a walkthrough of the SITE to evaluate the current condition of the building and <br /> identified HMW's, and identify any changes to the facility which may have occurred since <br /> the preparation of the previously referenced environmental reports. <br /> <br /> 2. Meet with project representatives (i.e. city, architect) to formulate a phasing plan, project <br /> milestones and lines of communication for the project. <br /> <br /> 3. Develop the HMW technical specifications for the removal and disposal of the confirmed <br /> asbestos containing materials (ACM); lead based paint (LBP), mold and other hazardous <br /> wastes identified in the facility. The abatement plan will be prepared in accordance with <br /> the applicable local, state and federal asbestos, lead, mold and other applicable <br /> regulations. The specifications will define abatement practices, procedures and <br /> inspection protocols, and disposals requirements. The specification will be prepared by <br /> appropriately licensed personnel in accordance with current state and federal <br /> regulations. The specification will include the following: <br /> <br /> ➢ Project scope of work and phasing <br /> ➢ Materials to be used during the project <br /> ➢ Applicable federal, state and local regulations (TDSHS, EPA, OSHA) <br /> Contractor submittals such as certifications, work plans, notifications, disposal <br /> arrangements and worker training documents <br /> ➢ Worker protection requirements <br /> ➢ Work area preparation procedures <br /> ➢ Hazardous materials (asbestos, lead and mold) removal methods <br /> ➢ Work area decontamination/cleaning procedures <br /> ➢ Final clearance requirements <br /> ➢ Waste disposal procedures <br /> <br /> 4. Conduct a meeting with project team members to review proposed HMW technical <br /> specifications to ensure that the scope of the remediation correlates with the proposed <br /> renovation and preservation of the historic elements of the facility. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> 324 <br />
The URL can be used to link to this page
Your browser does not support the video tag.