Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> EXHIBIT B <br /> <br /> <br /> I - RESERVOIR STORAGE <br /> <br /> <br /> Percent of <br /> Usable Water Supply <br /> Feature Elevation Storage(1) Storage <br /> (ft NGVD) (ac-ft) <br /> Flood Control 460.5-451.0 64,500 <br /> <br /> Water Supply 451.0-415.0 109,600 100.00 <br /> <br /> City of Paris 109,600 100.00 <br /> <br /> TOTAL 174,100 <br /> <br /> (1) Storage remaining after 100 years of sedimentation, beginning from <br /> the date the Project became operational, 1 October 1967. <br /> <br /> <br /> <br /> II - ALLOCATION OF ACTUAL COST (2) <br /> <br /> <br /> Flood Control $1,562,775 <br /> <br /> Water Supply <br /> Storage 3,093,407 <br /> Conduit 7,000 <br /> <br /> Recreation 4,601,906 <br /> <br /> Fish and Wildlife 82,328 <br /> <br /> TOTAL $9,347,416 <br /> <br /> (2) Excludes $105,000 non-reimbursable costs for relocation of roads <br /> above replacement-in-kind standards. Includes $251,334 for the value of <br /> Federally owned lands. Total cost of Project is $9,452,416. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> 8 <br /> <br /> 147 <br />