Laserfiche WebLink
EXHIBIT B <br />I - RESERVOIR STORAGE <br />Feature <br />Flood Control <br />Water Supply <br />City of Paris <br />TOTAL <br />( f t NGVD ) <br />Elevation <br />460.5-451.0 <br />451.0-415.0 <br />Percent of <br />Usable water Supply <br />Storage(1) Storage <br />(ac-ft) <br />64,500 <br />109,600 100.00 <br />109,600 100.00 <br />174,100 <br />(1) Storage remaining after 100 years of sedimentation, beginning from <br />the date the Project became operational, 1 October 1967. <br />II - ALLOCATION OF ACTUAL COST (2) <br />Flood Control $1,562,775 <br />Water Supply <br />Storage 3,093,407 <br />Conduit 7,000 <br />Recreation 4,601,906 <br />Fish and Wildlife 82,328 <br />TOTAL $9,347,416 <br />(2) Excludes $105,000 non-reimbursable costs for relocation of roads <br />above replacement-in-kind standards. Includes $251,334 for the value of <br />Federally owned lands. Total cost of Project is $9,452,416. <br />8 <br />