Laserfiche WebLink
At the unit prices shown on the Unit Price Bid Schedule included in the Contract <br />Documents. <br />Article 5. PAYMENT PROCEDURES <br />CONTRACTOR shall submit Applications for Payment in accordance with the General <br />Conditions. Applications for Payment will be processed by ENGINEER, as provided in the <br />General Conditions. <br />The CITY shall retain 10% of th~r ~ Doc ~ments. When the until as subspta tially complep ~te,the <br />of all Work covered by the Con <br />retained amount may be reduced to 5%, at the CITY'S discretion. <br />Article 6. INTEREST <br />If the contract amount of this contract isn ~~e than <br />onta 400mo0unt excetedss$4001000, nodinter st <br />CONTRACTOR on retained money. Whe <br />will be paid unless required by law. <br />Article 7. CONTRACTOR'S REPRESENTATIONS <br />In order to induce CITY to enter into this Agreement, CONTRA.CTOR makes the following <br />representations: <br />7.1 CONTRACTOR has familiarized himself with the nature and extent of the Contract <br />or furnsh ng ofd the Re`gu~l kions that, <br />Documents, Work, site, locality, and all llocal <br />in any manner, may affect cost, prog ess, performa <br />7.2 CONTRACTOR has studied carefully all reports of explorations and tests of subsurface <br />conditions and drawings of physical conditions, if any, which are contained or identified <br />in the Contract Documents, and accepts the determination set forth in the Contract <br />Documents of the extent of the technical data contained in such reports and drawings <br />upon which CONTRACTOR is entitled to rely. <br />7.3 CONTRACTOR has obtained and carefully studied (or assumes responsibility for <br />obtaining and carefully studying) all such examinations, investigations, explorations, <br />tests, reports and studies in addition to, or to supplement, those refened to above, which <br />pertain to the subsurface or physical can dlt or furni hingnof the Work asSCONTRACTOR <br />may affect the cost, progress, perform <br />considers necessary for the performance or furnishing of the Work at the Contract Price, <br />within the Contract Time and in accordance with the other terms and conditions of the <br />Contract Documents, and no additional examinations, investigations, explorations, tests, <br />reports, studies or similar information or data are, or will be, required by <br />CONTRACTOR for such purposes. <br />7.4 CONTRACTOR has reviewed and checked all information and data shown or indicated <br />on the Contract Documents with respect to existing Underground Facilities at or <br />contiguous to the site and assumes responsibility for the accurate location of all <br />_ I V) 20 <br />