Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> EXHIBIT A <br /> <br /> Scope of Services <br /> <br /> <br /> • On-site assessment of Lake Gibbons dam. <br /> • Hydrologic and hydraulic analysis of Lake Gibbons dam, including breach analysis and <br /> inundation map preparation. <br /> • Operations and maintenance plan for Lake Gibbons dam. <br /> • Surveying of cross sections downstream of dam (approximately 5 locations). <br /> • Determine residences and other critical structures within the inundation area. Collect names, <br /> phone numbers, and addresses for inclusion in the EAP. <br /> • Additional surveying as may be necessitated by the H&H analysis. <br /> • Preparation of the final report complete with recommendations. <br /> • Prepare a final report and present the findings to the appropriate city officials. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> 6 <br /> <br /> 77 <br />