My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-Professional services with Hayter Engineering
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2010
>
12 December
>
12/20/2010
>
07-Professional services with Hayter Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2010 6:14:33 PM
Creation date
12/17/2010 6:14:32 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
07
Doc Type
Agenda
CITY CLERK - Date
12/20/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> Bn-an W. Shaw, Ph.D., Chairman <br /> Buddy Garcia, Commissioner <br /> Carlos Rubinstein, Coin rnissioner <br /> Mark R. Vickery, P.C., Executive Director <br /> <br /> <br /> TEXAS COMMISSION ON ENVIRONMENTAL QUALITY <br /> Protecting Texus by Reducing and Preventing Pollution <br /> <br /> December 7, 2010 <br /> <br /> <br /> <br /> Michael N. Tibbets, P.E. <br /> Project Manager <br /> Hayter Engineering <br /> 4445 S.E. Loop 286 <br /> Paris, TX 75460 <br /> <br /> Re: Emergency Action Plans (EAPs) <br /> Lake Crook Dam - Inventory No. TXo1841 <br /> Lake Gibbons Dam - Inventory No. TXo1840 <br /> Dear Mr. Tibbets: <br /> <br /> On December 6, 2010, the Texas Commission on Environment Quality (TCEQ) Dam <br /> Safety Program received an extension request for the Emergency Action Plan (EAP) for <br /> the above referenced dams. In accordance with Title 3o Texas Administrative Code <br /> (TAC) Chapter 299 Dams and Reservoirs (effective January 1, 2009), the request was <br /> reviewed and an extension has been granted. <br /> According to 3o TAC §299.61 (d), "If an owner cannot complete the emergency action <br /> plan within the two years required in subsection (b) of this section, the owner shall <br /> request an extension of time showing cause or a reasonable basis for the need for an <br /> extension and providing a time frame to complete." A complete PDF format of 3o TAC <br /> Chapter 299 can be found on the TCEQ website at hn://www.tceq_state.tx.us_/rulesJ <br /> Based on the timeline submitted with your request, the EAP submittal deadline has <br /> been extended to January 1, 2ox2. The TCEQ appreciates your cooperation with the <br /> preparation of the EAP. Should you have any questions or concerns, please feel free to <br /> contact Diana Wang, P.E. at (512) 239-1372 or Jennifer Garcia, P.E. at (512) 239-0433- <br /> <br /> Sincerely, <br /> <br /> <br /> Diana H. Wang, P.E. <br /> Engineer, Dam Safety Se ion <br /> Field Operations Support Division, MC -114 <br /> <br /> <br /> <br /> <br /> <br /> P.O. Box 13087 Austin, Texas 78711-3057 512-239-1000 Internet address: wrovw.tceq.state.tx.us <br /> <br /> <br /> 79 <br />
The URL can be used to link to this page
Your browser does not support the video tag.