My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-126 RES AWARDING CONTRACT TO SPANN CONCRETE FOR PERISTYLE
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2010
>
2010-126 RES AWARDING CONTRACT TO SPANN CONCRETE FOR PERISTYLE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 12:27:03 PM
Creation date
1/12/2011 3:09:22 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSTRUCTION AGREEMENT <br />STATE OF TEXAS § <br />§ KNOW ALL MEN BY THESE PRESENTS: <br />COUNTY OF LAMAR § <br />This Construction Agreement is inade and entered by and between the City of Paris, Texas, <br />a home-rule municipal corporation (hereinafter referred to as "CITY") and Spann Concrete <br />Construction, LLC, 1640 NW Loop 286, Paris, Texas 75460, a Texas limited liability corporation <br />(hereinafter referred to as "CONTRACTOR") to be effective from and after the date herein <br />provided. <br />For and in consideration of the covenants and agreements contained herein, and for the <br />mutual benefits to be obtained hereby, the parties hereto agree as follows: <br />1. EFFECTIVE DATE <br />The effective date of this agreement shall be the date this Agreement is last signed by the <br />parties hereto. <br />II. CONTRACT DOCUMENTS <br />That the contract documents which are hereby made a part of this Agreement by actual <br />attachment or by reference hereto are as follows: <br />Exhibit A Advertisement for Bids <br />Exhibit B Architect's specifications, designs, drawings, reports and/or studies (on file <br />with the Architect and/or the City Engineer) <br />Exhibit C Spann Concrete Construction, LLC's Proposal <br />III. THE WORK <br />CONTRACTOR agrees to provide all labor, equipment and supplies to perform the Stone <br />Wark portion of the Peristyle Renovation and Restoration Project, including but not limited to <br />complete dismantling, transporting and storage of the limestone elements of the existing peristyle <br />structure, cleaning, repairing and/or replacement of individual stone blocks, reassembly of the <br />peristyle structure, and final cleaning and touch-up of the completed Bywaters Park Peristyle in the <br />City of Paris more specifically described in the Advertisement for Bid attached hereto as Exhibit <br />A, the Architect's specifications, designs and/or drawings related to the Project on file with the <br />Architect and/or the City Engineer (Exhibit B), and the Contractor's Proposal (Exhibit C); <br />provided, however, that in the event of a perceived conflict or ambiguity between this Agreement <br />and the Contract Documents, the provisions of this Agreement, the Architect's specifications, <br />Page 1 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.