My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-130 RES AGREEMENTS FOR PROFESSIONAL SERVICES WITH HAYTER ENGINEERING REGARDING PREPARATION OF EMERGENCY ACTION PLANS FOR LAKE CROOK AND LAKE GIBBONS
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
2010
>
2010-130 RES AGREEMENTS FOR PROFESSIONAL SERVICES WITH HAYTER ENGINEERING REGARDING PREPARATION OF EMERGENCY ACTION PLANS FOR LAKE CROOK AND LAKE GIBBONS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 12:27:47 PM
Creation date
1/12/2011 3:20:55 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bn-an W. Shatv, Ph.D., Chctirrrtarz <br />Buddy Garcia, Commissioner <br />Carlos Rubinstein, Co»zmissiorzer <br />TMiark R. Vickery, P.G., Executiue Director <br />TEXAS C0MMISSION ON E\VIRONMENTAL QUALITY <br />Profecting Texus hy Reduciny anrl J'reventing Pollulion <br />December 7, 2010 <br />Michael N. Tibbets, P.E. <br />Project Manager <br />Hayter Enguieering <br />4445 S.E. Loop 2-86 <br />Paris, TX 75460 <br />Re: Emergency Actian Plans (EAPs) <br />Lake Crook Dam - Inventory No. TXoi84i <br />Lake Gibbons Darn - Inventary No, TXo1840 <br />Dear Mr. Tibbets: <br />On December 6, ?oio, the Texas Commission on Environment Quality (TCEQ) Dam <br />Safety Program received an extension request for the Emergency Action Plan (EAP) for <br />the above referenced dams. In accordance with Title 3o Texas Administrative Code <br />(TAC) Chapter 299 Dams and Reservoirs (effective January i, 2009), the request was <br />reviewed and an extension has been granted. <br />According to 3o TAC §299.61 (d), "If an owner cannot complete the emergency action <br />plan within the two years required in subsection (b) of this section, the owner shall <br />request an extension of time shoti2ng cause or a reasonable basis for the need for an <br />extension and providing a time frame to complete." A complete PDF format of 3o TAC <br />Chagter 299 can be found on the TCEQ website at http: //www.tceq.state.tx.us/rulesl <br />Based on the timeline submitted with your request, the EAP submittal deaclline has <br />beern extended to January i, 2oi2. The TCEQ appreciates your cooperation with the <br />preparation of the EAP. Should you have any questions or concerns, please feel free to <br />contact Diana Wang,P.E. at (512) 239-1372 or Jennifer Garcia, P.E. at C512) 239-0433• <br />Sincerely, <br /> <br />Diana H. Wang, P.E. <br />Engineer, Dam Safety Se ion <br />Field Operations Support Division, MC -174 <br />P.O. Sox 13087 Austin, Texas 78711-3057 512-239-1000 lnternet address: Nv\n?w.tceq.state.tx.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.