My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-014 RES ACCEPTING PROPOSAL OF HAYTER ENGINEERING INC FOR TEXAS DEPT OF AGRICULTURE MAIN STREET PROGRAM FOR SIDEWALK IMPROVEMENTS
City-of-Paris
>
City Clerk
>
Resolutions
>
2011-2020
>
2011
>
2011-014 RES ACCEPTING PROPOSAL OF HAYTER ENGINEERING INC FOR TEXAS DEPT OF AGRICULTURE MAIN STREET PROGRAM FOR SIDEWALK IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 10:58:50 AM
Creation date
2/22/2011 12:59:09 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
responsibility for CONTRACTOR'S failure to furnish and perform their work in <br />accordance with the contract documents. <br />2.5.3 Inter2retations and Clarifications <br />ENGINEER shall issue necessary interpretations and clarifications of the contract <br />documents and in connection therewith prepare work directive changes and change <br />orders, as required. <br />2.5.4 Shop Drawings & Substitutes <br />ENGINEER shall review or take appropriate action, on substitute materials proposed <br />by CONTRACTOR, shop drawings, samples and other data which CONTRACTOR is <br />required to submit, but only for general conformance with the design concept of the <br />project and the information given in the contract documents. Such review shall not <br />extend to means, methods, techniques, sequences or procedures of construction ar to <br />safety precautions and programs incident thereto. <br />2.5.5 Inspections and Tests <br />ENGINEER shall have authority, as CITY'S representative, to require special <br />inspection or testing of the work, and shall receive and review all certificates of <br />inspections, testing and approvals required by laws, regulations, codes, orders or the <br />contract documents, to determine generally that their content complies with the <br />requirements of, and the results certified indicate compliance with, the contract <br />documents. <br />2.5.6 Disputes between CITY and CONTRACTOR <br />ENGINEER shall act as initial interpreter of the contract documents and judge of the <br />acceptability of the work, and make decisions on all claims of CITY and <br />CONTRACTOR relating to the acceptability of the work or the interpretation of the <br />requirements of the contract documents. ENGINEER shall not be liable for the results <br />of any such interpretations or decisions rendered in good faith. <br />2.5.7 Applications for PaMent <br />Based on ENGINEER'S observations as an experienced and qualified design <br />professional, on information provided by the on-site observer and on review of <br />applications for payment and the accompanying data and schedules; ENGINEER shall <br />determine the amount owed to CONTRACTOR and recommend in writing payments <br />to CONTRACTOR. This recommendation will constitute a representation to CITY <br />that the work has progressed to the point indicated, and that, to the best of <br />ENGINEER'S knowledge, information and belief, the quality of such work is <br />generally in accordance with the contract documents. However, ENGINEER will not <br />thereby be deemed to have made exhaustive, continuous or detailed reviews or <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.