Laserfiche WebLink
CHANGE ORDCR <br />Order Na. One <br />Date: .March 2. 2011 <br />Agreernent Date: August S. 2010 <br />NAME OF PROJECT: Trail de Paris Exnansion S.E. 8"' Street ia S.E. i20' Street <br />HEI #I$0039-280B <br />(?WNER: Citv af Paris <br />CUN'1'KAC'I'UR: Richard Drake Construction Comp@nv <br />The £ollowing changes are lxereby inade to tbe CONTRACT DOCUMENTS: Tlle rail car being <br />converted to a pedestrian bridge needs additional niodifications to properly stiffen both ends af <br />the raii car to iise a pedesirian bridge. Also, add 150 calendar days to the contract time. <br />Justif catian: See attached letter fram Structural Engineer regarding rail car modifications. <br />Regarding dhe time extension, structurat design moditicatioias and sbnornial weather cond.itions <br />have significantly hindered the Contractor's Progress. <br />Change to CONTRACT PRICE: <br />Original CONTRAC7' FRICE: $111,553.0 <br />a <br />Current CONTRACT PRICE adjusted by previous CHANGE C7RDER $ 111,553.00 <br />Tlie CONTRACT PRICE due to this CHANGE ORDER will be increased by: $ 6,124.00 <br />The new CONTRACT PRICE including this CHANGE ORDER will be $ 117.677.00 <br />Cllange to CONTRACT TIME: <br />The CONTRACT TIME will be incrcascd by 150 calendar days. <br />The date fox completion of aIl work will be June 25, 2011. <br />Appravals Required: <br />To be effective this Order musi be approved by the Federal agency i.f it changes the scope or <br />objective of the PROJECT, or as mmy otherwise be required by the SI7PPLEMENTAL <br />GENERAL CONDITIONS. <br />Owner: <br />Contractor: <br />° F <br />~c <br />MICl1AEL J t30NMAN <br />- ~?22 <br />F-ooa3 is <br />s►& ) 41 . <br />CONTRACT DOCUMEN'1'S fOR CONS'CRi1C1'1pN Qf <br />FEDERALLY A55IS7ED WATER ANl] Sf:WF.R PROJEt'7':i <br />EXHIBIT k <br />C7:iG1 / <br />Dacumcnt )do. 10 <br />~~i." 1~9~~~~~'~ 8e Ordcr Pagc 1 of 1 <br />. m4~~,. <br />N A L <br />Z 417 <br />