Laserfiche WebLink
From: RIC~AAZt L)Qp,Y's a4sl-Rumoij fi LP(Name) <br /> <br />lD 90 U.1y 271 KlOR.Z-}'E (Address) <br />P61W t 'E ti "-ti I541 3 (Address) <br />Re: April 1, 2011 through March 31, 2012 Demolition and construction of Curb/Gutter, <br />Driveway Approaches and Reinforced Concrete Sidewalk. <br />Pursuant to and in compliance with your bid specifications for the demolition and construction of <br />Curb/Gutter, Driveway Approaches and Reinforced Concrete Sidewalk, we bid the following: <br />• Please submit all bids in unit prices not lump sum per the estimated quantities provided. <br />ZI 5-° <br />per foot for typical curb and gutter installation (city standard) <br />4500 L.F. <br />m <br />$ S Removal and Disposal per L.F. <br />$2- (P Total price for 6" typical curb and gutter (sum of the other two prices) <br />s 3 ~ Sb per foot for curb and gutter to match eusting curb style installed <br />(ie. WPA style curb) 50 L.F. <br />$ <br />3 (a Sn <br />J~~ C!SI <br />Removal and Disposal per L.F. <br />Total price for WPA curb and gutter (sum of other two pnces) <br />per square foot for the standard residential driveway approach installation <br />(city standard) 4000 S.F. <br />)5b <br />$ I Removal and Disposal per S.F. <br />~ ~50 <br />Total price for driveway approach (sum of the other two prices) <br />$ 4 <br />per square foot for reinforced concrete sidewalk (city standard) <br />2500 S.F. <br />Xb <br />$ Removal and Disposal per S.F. <br />Sb <br />Total price for sidewalk replacement (sum of other two prices) <br />BY <br />F YH C-&,-- Title: ESTI W\s"-r02 -aAc Dated the Js-r- of A &14 )2011. <br />EkHIBIT E <br />