My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-029 RES AWARDING CONTRACT FOR REPLACEMENT OF CONCRETE CURB & GUTTERS, DRIVEWAY APPROACHES AND REINFORCED CONCRETE SIDEWALKS TO RICHARD DRAKE CONSTRUCTION
City-of-Paris
>
City Clerk
>
Resolutions
>
2011-2020
>
2011
>
2011-029 RES AWARDING CONTRACT FOR REPLACEMENT OF CONCRETE CURB & GUTTERS, DRIVEWAY APPROACHES AND REINFORCED CONCRETE SIDEWALKS TO RICHARD DRAKE CONSTRUCTION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 11:00:03 AM
Creation date
3/17/2011 12:32:43 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF PARIS <br />DEPARTMENT OF PUBLIC WORKS <br />SPECIFICATIONS FOR <br />DEMOLITION AND CONSTRUCTION OF <br />CURB/GUTTER, CONCRETE SIDEWALK AND <br />STANDARD DRIVEWAY APPROACHES <br />Requirements• <br />It is estimated that 5,000 linear feet of Curb and Gutter, 4,000 square feet of Driveway <br />Approaches and 2,500 square feet of Reinforced Concrete Sidewalk will be repaired during <br />the period of April 1, 2011 through March 31, 2012. <br />Exact quantities ar feet cannot be detennined, but best estimates are as indicated above. <br />Quantities may be increased or decreased to meet the requirements of the Street Operations <br />Division of the Public Works Department during the period shown above. Minimum quantities <br />are not guaranteed. <br />Specifications/Repuirements: <br />Demolition and construction of Curb/Gutter, Standard Driveway Approaches and Concrete <br />Sidewalk must conform to the following guidelines and attached drawings. <br />A) Approved bidder is responsible for the demolition, disposal and cleanup of existing <br />curb/gutter, driveway approaches or sidewalk. <br />B) Approved bidder is responsible for the construction of new curb/gutter, driveway <br />approaches or sidewalk. All construction must comply with American Disabilities Act <br />and standard TXDOT specifications, except as amended by the project specifications or <br />drawings to be provided by the City. <br />C) Approved bidder is responsible for keeping the project area clean during construction and <br />he is responsible for final cleanup of project site. <br />D) All bids must be accompanied by a properly executed and completed Insurance Affidavit <br />in the form attached with this Bid Proposal. <br />E) Within 10 days after written notification of award of the contract the successful bidder <br />shall execute and furnish to the City a contract in a form approved by the City Attorney <br />along with: (1) a performance bond and a payment bond, with powers of attorneys <br />attached, each in the full amount of the contract price, executed by a surety company or <br />surety companies authorized to execute surety bonds and from the list of approved surety <br />companies maintained by the United States Treasury Department, and (2) a properly <br />executed Certificate of Insurance evidencing that the successful bidder has inet all the <br />Insurance Requirements required herein. <br />
The URL can be used to link to this page
Your browser does not support the video tag.