My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
14-Change order #2 to Richard Drake Contract for Trail de Paris between SE 8th and 12th
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2011
>
03 March
>
03-28-11
>
14-Change order #2 to Richard Drake Contract for Trail de Paris between SE 8th and 12th
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2012 10:28:17 AM
Creation date
3/24/2011 4:53:30 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE ORDER <br />Order No. Two <br />Date: March 18, 2011 <br />Agreement Date: August 8, 2010 <br />NAME OF PROJECT: Trail de Paris Expansion S.E. 8t" Street to S.E. 12'' Street <br />HEI #180039-280B <br />OWNER: Citv of Paris <br />CONTRACTOR: Richard Drake Construction Companv <br />The following changes are hereby made to the CONTRACT DOCUMENTS: The final trail route <br />selected by the Parks Department requires the addition of materials per the attachment. <br />Justification: The final route was selected based on minimizing the amount of tree clearing <br />required. <br />Change to CONTRACT PRICE: <br />Original CONTRACT PRICE: <br />$ 111,553.00 <br />Current CONTRACT PRICE adjusted by previous CHANGE ORDER $ 117,677.00 <br />The CONTRACT PRICE due to this CHANGE ORDER will be increased by: $ 4,629.50 <br />The new CONTRACT PRICE including this CHANGE ORDER will be $ 122,306.50 <br />Change to CONTRACT TIME: Start date: September 22, 2010 <br />Completion date as of previous change orders: June 25, 2011 <br />The CONTRACT TIME will be increased by 0 calendar days for this change order. <br />The date for completion of all work will be June 25, 2011. <br />Approvals Required: <br />To be effective this Order must be approved by the Federal agency if it changes the scope or <br />objective of the PROJECT, or as may otherwise be required by the SUPPLEMENTAL <br />GENERAL CONDITIONS. <br />Owner: <br />Engineer: <br />Hayter Engineering, Inc. TBPE F-000315 <br />Contractor: <br />CONTRACT DOCUMENTS FOR CONSTRUCTION OF Document No. 10 <br />FEDERALLY ASSISTED WATER AND SEWER PROJECTS Change Order: Page 1 of 1 <br />O.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.