My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
15-Contract with R.K.Hall Const. Co. South Collegiate Drive
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2011
>
05 May
>
05/09/2011
>
15-Contract with R.K.Hall Const. Co. South Collegiate Drive
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2011 11:33:15 AM
Creation date
5/5/2011 11:33:15 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
15
Doc Type
Agenda
CITY CLERK - Date
5/9/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> CHANGE ORDER <br /> <br /> Order No. One <br /> <br /> Date: April 6, 2011 <br /> <br /> Agreement Date: July 1, 2010 <br /> NAME OF PROJECT: South Collegiate Drive Reconstruction <br /> <br /> <br /> <br /> OWNER: C~y of Pari <br /> <br /> CONTRACTOR: R. K. 11all Copstruction, LTD <br /> <br /> The following changes are hereby made to the CONTRACT DOCUMENTS: <br /> 1) Install one fire hydrant extension @a, $260/each - $260.00. <br /> 2) Remove 797.33 SY concrete pavement (average 12" thick) @ $10.00/SY = $7,973.30. <br /> 3) 90 calendar day time extension. <br /> Justification: <br /> 1) Depth of existing water main unknown until location for new fire hydrant was excavated. <br /> 2) Existing concrete pavement was underneati existing asphalt pavement. <br /> 3) Due to easement acquisition and utility relocation delays not controlled by contractor. <br /> Change to CONTRACT PRICE: <br /> <br /> Original CONTRACT PRICE: $1.465.740.40 <br /> <br /> Current CONTRACT PRICE adjusted by previous CHANGE ORDER $ 1,465.740.40 <br /> <br /> The CONTRACT PRICE due to this CHANGE ORDER will be increased by: $ 8,233.30 <br /> <br /> The new CONTRACT PRICE including this CHANGE ORDER will be $ 1,473.973.70 <br /> Change to CONTRACT TIME: <br /> <br /> The CONTRACT TIME will be increased by 90 calendar days. <br /> <br /> The date for completion of all work will be July 27, 2011. <br /> <br /> Approvals Required: <br /> To be effective this Order must be approved by the Federal agency if it changes the scope or <br /> objective of the PROJECT, or as may otherwise be required b the SUPPLEMENTAL <br /> GENERAL CONDITIONS. F <br /> <br /> Owner: <br /> Engineer; y- ••«.~.ai,...' <br /> Na, En Bering, Inc. TBPE F-000315 <br /> Contractor: t r` <br /> r <br /> CONTRACT DOCUMENTS FOR CONS"rR CTION OF ument No. 10 <br /> FEDERALLY ASSISTM WATER AND SEWER PROA;CI:S <br /> ~ ~ order: Page i of 1 <br /> h:b~ra A4 8'? <br />
The URL can be used to link to this page
Your browser does not support the video tag.