My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
18-Grand Theater Hazardous Materials Remediation Phase I Project
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2011
>
05 May
>
05/09/2011
>
18-Grand Theater Hazardous Materials Remediation Phase I Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2011 5:17:40 PM
Creation date
5/5/2011 5:17:37 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
18
Doc Type
Agenda
CITY CLERK - Date
5/9/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> Scope of Work - Asbestos Abatement Irerracon <br /> Grand Theatre ® 21 Lamar Avenue, Paris, Texas <br /> April 14, 2011 8 T erracon Project No. 94107645 <br /> <br /> Outside Work Area: Maintain an average airborne count outside the Work Area below <br /> the Permissible Exposure Limit (PEL) of 0.1 f/cc of air. <br /> <br /> If any air sample taken outside the Work Area exceeds the PEL, immediately stop work <br /> until the source of the elevated fiber readings can be determined by the CONSULTANT. <br /> Immediately take corrective as instructed by the CONSULTANT. <br /> <br /> Decontaminate the affected area in accordance industry standard methods. <br /> <br /> ANALYTICAL METHODS: <br /> <br /> The following methods will be utilized at the discretion of the CONSULTANT in collecting <br /> and analyzing air samples: <br /> <br /> Phase Contrast Microscopy (NIOSH 7400 Method, Issue 2, Revision 3 or OSHA <br /> Reference Method) <br /> <br /> Transmission Electron Microscopy (40 CFR Part 763, Subpart E, Appendix A) <br /> <br /> SAMPLE PROTOCOLS: <br /> <br /> General: The number and volume of air samples taken by the CONSULTANT will <br /> generally be in accordance with the following schedule. Sample quantities, locations, <br /> volumes and methodologies may vary depending upon the analytical method, project <br /> layout, procedures used and at the discretion of the CONSULTANT. <br /> <br /> SCHEDULE OF AIR SAMPLES FOR CONTAINMENT(S): <br /> <br /> Daily Sample Schedule (per 8-hour work period): The CONSULTANT will generally take <br /> the following samples on a daily (8-hour work period) basis. The number of samples <br /> <br /> may vary according to site plan and on authorization of CONSULTANT. <br /> <br /> Base Line Sample Schedule: The CONSULTANT will secure the following air samples <br /> to establish a Base Line before start of Work. The number of samples may vary <br /> according to site plan and on authorization of CONSULTANT. <br /> <br /> Location Sampled Minimum Number Minimum Sample Planned Analytical <br /> of Samples Volume Method <br /> <br /> Each Work Area 3 1,250 Liters PCM <br /> <br /> <br /> <br /> <br /> <br /> i'vic- 2urro cl'.a <br /> - pirzao!Cite. . jI <br /> <br /> 139 <br />
The URL can be used to link to this page
Your browser does not support the video tag.