Laserfiche WebLink
<br /> <br /> Fungal-Biological Hazard Remediation Protocol Irerracon <br /> Grand Theater ■ 21 Lamar Street, Paris, Texas <br /> April 11, 2011 ■ Terracon Project No. 94117645 <br /> <br /> <br /> V. Representative air samples shall be collected from within the containment, the outdoor <br /> environment, and analyzed by standard optical light microscopy methodology. Total <br /> bioaerosol analysis must be conducted by a licensed Mold Analysis Laboratory. Any <br /> area whose air test does not meet post remediation criteria will be re-tested following <br /> cleaning and air scrubbing of those areas. Total bioaerosol analysis will be used to <br /> assess the second floor containment. <br /> <br /> vi. Total bioaerosol analytical clearance criteria will be based on qualitative and quantitative <br /> similarity between indoor samples and ambient outdoor control samples collected <br /> contemporaneously. Air samples will be collected and analyzed in a manner that <br /> provides a minimum detection limit of 43 spore/m3. Qualitatively consistent/dissimilar <br /> fungal aerosols within the containment, relative to the outdoor environment, should not <br /> exceed 650 spore/m3. <br /> <br /> <br /> 13.0 WASTE DISPOSAL <br /> <br /> Waste materials will be double bagged or wrapped in six (6) millimeter polyethylene <br /> unlabeled disposal bags. Disposal bags will be HEPA vacuumed prior to removal from the <br /> work areas. Debris will be disposed as construction waste and placed in an enclosed, <br /> secured dumpster provided by the contractor unless otherwise noted. <br /> <br /> 14.0 POST PROJECT SUBMITTALS <br /> <br /> Post project submittals and invoices shall be submitted to City of Paris, in accordance with <br /> Texas Department of State Health Services (TDSHS) regulations contained in "The Texas <br /> Mold Assessment and Remediation Rules" (25 TAC §295.301-295.338). <br /> <br /> 15.0 MITIGATION OF MOISTURE <br /> <br /> <br /> The building owner is responsible for the mitigation of moisture intrusion and the required <br /> remedial actions should be provided to the MAC. <br /> <br /> Roof repairs must be verified to ensure that moisture intrusion due to roof leaks has been <br /> mitigated. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> NIAC 0107/ 11-10-12 <br /> <br /> 154 <br />